Boiler Blowdown - Conductivity Check
Boiler surface-blowdown trigger - when conductivity exceeds 3 000 µS/cm for auxiliary boilers.
Loading calculator…
Formula, assumptions, and limits
| Symbol | Meaning | Unit |
|---|---|---|
| Total Dissolved Solids (as conductivity) | µS/cm |
Source: ASME Boiler Water Chemistry
In short
Boiler surface-blowdown trigger - when conductivity exceeds 3 000 \u00b5S/cm for auxiliary boilers.