Breakdown exclusion calculator
Apportion breakdown time between vessel and shore. Vessel-side breakdowns are owner's account (excluded from charterer's laytime); shore-side breakdowns are charterer's account (counted as laytime).
Loading calculator…
Formula, assumptions, and limits
| Symbol | Meaning | Unit |
|---|---|---|
| Breakdown duration | h | |
| Vessel / shore / shared | ||
| 1.0 vessel, 0.0 shore, 0.5 shared |
Source: BIMCO LAYTIMEDEFS 2013
In short
Apportion breakdown time between vessel and shore for laytime accounting.