EEDI Required - the phase-reduced target
Look up the Required EEDI for a newbuild: ship-type reference line reduced by the phase factor per MEPC.328(76).
Loading calculator…
Formula, assumptions, and limits
| Symbol | Meaning | Unit |
|---|---|---|
| Maximum allowed attained EEDI | g CO₂ / (t·nm) | |
| Ship-type reference constant | ||
| Ship-type reference exponent | ||
| DWT (cargo) or GT (passenger/cruise) | DWT or GT | |
| Phase reduction factor | fraction |
Source: IMO MEPC.328(76); IMO MEPC.231(65)
In short
Look up the Required EEDI for a newbuild ship - reference line reduced by phase factor Z under IMO MEPC.328(76).