HVAC - Air Change Rate
Air-change rate (ACH) required for various marine spaces - engine room, accommodation, galley, battery room.
Loading calculator…
Formula, assumptions, and limits
| Symbol | Meaning | Unit |
|---|---|---|
| Air changes per hour | 1/h |
Source: ASHRAE Application Handbook; MLC 2006 Title 3
In short
Air-change rate (ACH) required for various marine spaces - engine room, accommodation, galley, battery room.