Equipment Number (IACS UR A1)
Anchor + chain sizing starts from the Equipment Number. IACS UR A1 combines displacement, side projected area and tier-level superstructure areas.
Loading calculator…
Formula, assumptions, and limits
| Symbol | Meaning | Unit |
|---|---|---|
| Ship displacement at SLWL | t | |
| Effective height × beam (hull+superstructure) | m² | |
| Sum of tier-level superstructure areas | m² | |
| Side-projected area above SLWL | m² | |
| Equipment number |
Source: IACS UR A1 - Anchor Equipment
In short
Anchor + chain sizing starts from the Equipment Number.