MARPOL Annex VI - EEDI Required

Required EEDI for new-build ship per MEPC.281(70) - the baseline the designer must meet vs reference line.

EEDIMEPC.281Decarb
Reference line
4.36gCO₂/t·nm
Required EEDI
3.05gCO₂/t·nm

Formula, assumptions, and limits

EEDIreq=a⋅DWT−c⋅(1−Xphase)\text{EEDI}_{req} = a \cdot DWT^{-c} \cdot (1 - X_{phase})
SymbolMeaningUnit
a,ca, cSegment reference coefficients
XphaseX_{phase}Phase reduction factor

Source: MEPC.281(70) / MEPC.365(79)

In short

Required EEDI for new-build ship per MEPC.