Dock Water Allowance (DWA)
Loadline draft correction for brackish water. When the ship's dock-water density lies between 1.000 and 1.025, the Summer load line may be submerged by the dock water allowance without violating ICLL.
Loading calculator…
Formula, assumptions, and limits
| Symbol | Meaning | Unit |
|---|---|---|
| Fresh water allowance | mm | |
| Dock-water density | kg/m³ | |
| Dock water allowance | mm |
Source: IMO ICLL 1966; Derrett & Barrass Ch.8
In short
Loadline DWA for brackish water from FWA and dock water density.