Splash-Filling Rest Time (ISGOTT)
Minimum rest time after initial loading before ullage measurements, per ISGOTT: allow 30 min for static-electricity decay before any non-bonded measuring tape is lowered.
Loading calculator…
Formula, assumptions, and limits
| Symbol | Meaning | Unit |
|---|---|---|
| Initial filling velocity | m/s | |
| Rest time before non-bonded measurement | min |
Source: OCIMF ISGOTT 6th Ed., Ch.11 - Static electricity
In short
Minimum rest time after initial loading before ullage measurements, per ISGOTT: allow 30 min for static-electricity decay before any non-bonded measuring tape is lowered.