ShipCalculators.com

Splash-Filling Rest Time (ISGOTT)

Minimum rest time after initial loading before ullage measurements, per ISGOTT: allow 30 min for static-electricity decay before any non-bonded measuring tape is lowered.

TankerStatic
Loading calculator…

Formula, assumptions, and limits

trest=max(30,30v/1 m/s) if non-bondedt_\text{rest} = \max(30, 30 \cdot v / 1 \text{ m/s}) \text{ if non-bonded}
SymbolMeaningUnit
vvInitial filling velocitym/s
trestt_\text{rest}Rest time before non-bonded measurementmin

Source: OCIMF ISGOTT 6th Ed., Ch.11 - Static electricity

In short

Minimum rest time after initial loading before ullage measurements, per ISGOTT: allow 30 min for static-electricity decay before any non-bonded measuring tape is lowered.

Learn the theory Marine Tank Cleaning and Crude Oil Washing