How much cargo did the draft survey find?
Cargo weight from the drafts before and after cargo work · drafts to the perpendiculars · M/M/M for sag and hog · first and second trim corrections · dock water density · deductibles · ship's constant · list check · Updated 22 October 2026
Published by ShipCalculators.com. Method checked against UN/ECE ECE/ENERGY/19 (1992) on 22 October 2026. How calculators are checked
Answer
A draft survey weighs the cargo as the change in the ship's net displacement between the surveys before and after cargo work (UN/ECE ECE/ENERGY/19, 1992). In the worked example the net displacement rises from 11,617.66 t to 76,163.66 t, so 64,546.00 t was loaded, within ±322.73 t at the code's 0.5% accuracy.
Change the inputs below to recompute.
On this page
What a draft survey is
A draft survey is the weighing of a ship’s cargo by reading her drafts before and after cargo work and working each set into a displacement from the ship’s own hydrostatic tables.1 Each displacement is corrected for trim, hull deflection and the density of the water she floats in, and the ballast, fuel, fresh water and other weights aboard are taken off to leave a net figure; the cargo is the difference between the two net figures.1
Work out the cargo weight
Start from a worked survey
Constructed figures for trying the calculator; the arithmetic is the code's.
Loading survey, 225.00 m between perpendiculars, tables at 1.025 t/m³. Before cargo work: forward 5.22, midships 6.63, aft 7.80 m in water of 1.0180 t/m³, 27,962.45 t of ballast and stores. After: forward 12.32, midships 12.49, aft 12.60 m in water of 1.0200 t/m³, 2,314.50 t of ballast and stores.
Cargo loaded 64,546.00 t
- Cargo loaded
- Within the code's limits
±322.73 t at the code's 0.5%; ±64.55 t at 0.1%
Loaded: 64,546.00 t, the net displacement rising from 11,617.66 t before cargo work to 76,163.66 t after.
- Net before
- 11,617.66 tM/M/M 6.601 m
- Net after
- 76,163.66 tM/M/M 12.483 m
Cargo between the net displacements
The hull at each survey
Heights drawn 4.6 times the lengths.
- Trim corrections before
- −452.93 t
- Trim corrections after
- +30.25 t
- Density correction before
- −272.16 t
- Density correction after
- −384.70 t
- Ship's constant
- 367.66 t
Upright within ½°; constant 367.66 t, +3.6% from earlier surveys. Hydrostatics read at M/M/M 6.601 m and 12.483 m.
What this survey result means
Before loading, the drafts corrected to the perpendiculars give a trim of 2.657 m by the stern and sag 93 mm, so the tables are read at the M/M/M draft of 6.601 m: 40,305.20 t. The trim corrections add −452.93 t, the dock water at 1.0180 t/m³ takes off 272.16 t, and 27,962.45 t of ballast and stores leaves a net displacement of 11,617.66 t.
After loading, the drafts corrected to the perpendiculars give a trim of 0.288 m by the stern and sag 27 mm, so the tables are read at the M/M/M draft of 12.483 m: 78,832.60 t. The trim corrections add +30.25 t, the dock water at 1.0200 t/m³ takes off 384.70 t, and 2,314.50 t of ballast and stores leaves a net displacement of 76,163.66 t.
The difference, 64,546.00 t, is the cargo loaded. The UN/ECE code puts a survey to its standard within 0.5%, ±322.73 t here, and within 0.1%, ±64.55 t, under proper and favorable conditions. The ship's constant, the net displacement before loading less the lightship, is 367.66 t, +3.6% from the 355.00 t of earlier surveys, inside the code's ±10%.
Cite or share this calculation
ShipCalculators.com, “Draft Survey Calculator: Cargo Weight from Drafts.” Method: UN/ECE Code of Uniform Standards and Procedures for the Performance of Draught Surveys of Coal Cargoes, ECE/ENERGY/19 (1992), Form C lines 129 to 170 and Form E line 380. Inputs: LBP 225.00 m; before loading M/M/M 6.601 m, dock water 1.0180 t/m³, deductibles 27,962.45 t; after loading M/M/M 12.483 m, dock water 1.0200 t/m³, deductibles 2,314.50 t; lightship 11,250.00 t. Result: net displacement 11,617.66 t and 76,163.66 t; 64,546.00 t loaded, ±322.73 t at 0.5%; constant 367.66 t. https://shipcalculators.com/calculators/draft-survey
The citation names ShipCalculators.com as publisher; copying it adds today's date.
Drawings of the two surveys
The hull at each survey
Lengths to scale, heights drawn 4.2 times the lengths so the trim and the sag show.
Cargo between the two net displacements
List against the code's ½°
From table displacement to net, before
From table displacement to net, after
Deductibles before and after
Trim corrections by trim, before loading
The first correction is a straight line through zero, the second a parabola that is always positive; the dots are this survey's trim.
The cargo figure within the code's accuracy
- 0.5%: from
- 64,223.27 t
- to
- 64,868.73 t
- 0.1%: from
- 64,481.46 t
- to
- 64,610.55 t
What one reading error costs
| Error | Cargo |
|---|---|
| 1 cm on the M/M/M draft | 67.07 t |
| 0.001 t/m³ on the density | 76.94 t |
| 1 cm on the forward and aft drafts, trim 2 cm | 2.07 t |
| 1 t of ballast or stores | 1.00 t |
Form "C", the lines the surveyor signs
| 143 | Mean forward and aft at the perpendiculars | 6.531 m |
|---|---|---|
| 149 | Midships at amidships | 6.624 m |
| 150 | Sag | 0.093 m |
| 152 | M/M/M | 6.601 m |
| 155 | Trim between the perpendiculars | +2.657 m |
| 161 | Displacement (1) | 40,305.20 t |
| 162 | First trim correction | −499.99 t |
| 163 | Nemoto correction | +47.06 t |
| 166 | Displacement (2) | 39,852.27 t |
| 167 | Density correction | −272.16 t |
| 168 | Displacement (3) | 39,580.11 t |
| 169 | Deductibles | 27,962.45 t |
| 170 | Corrected displacement | 11,617.66 t |
| 143 | Mean forward and aft at the perpendiculars | 12.462 m |
|---|---|---|
| 149 | Midships at amidships | 12.489 m |
| 150 | Sag | 0.027 m |
| 152 | M/M/M | 12.483 m |
| 155 | Trim between the perpendiculars | +0.288 m |
| 161 | Displacement (1) | 78,832.60 t |
| 162 | First trim correction | +29.88 t |
| 163 | Nemoto correction | +0.37 t |
| 166 | Displacement (2) | 78,862.85 t |
| 167 | Density correction | −384.70 t |
| 168 | Displacement (3) | 78,478.16 t |
| 169 | Deductibles | 2,314.50 t |
| 170 | Corrected displacement | 76,163.66 t |
A draft survey by hand
Average the port and starboard drafts at each mark and move each mean to its perpendicular. Average forward, aft and midships as (forward + 6 × midships + aft) ÷ 8 and read the tables there. Add the two trim corrections, scale by dock density over table density, and take off the ballast and stores. Do it again after cargo work; the cargo is the difference.
Your survey worked step by step
Before loading
- Means of port and starboard: forward 5.220 m, aft 7.800 m, midships 6.630 m; trim between the marks +2.580 m over 218.50 m.
- To the perpendiculars: forward 5.220 m − 0.0177 = 5.202 m; aft 7.800 m + 0.0590 = 7.859 m; midships 6.630 m − 0.0059 = 6.624 m.
- M/M/M: (5.202 + 6 × 6.624 + 7.859) ÷ 8 = 6.601 m; sag 93 mm.
- First trim correction: +2.6568 × −6.70 × 63.20 × 100 ÷ 225.00 = −499.99 t.
- Second trim correction: 50 × 2.6568² × (912.0 − 882.0) ÷ 225.00 = +47.06 t.
- Density: (40,305.20 − 499.99 + 47.06) × 1.0180 ÷ 1.025 = 39,580.11 t, a correction of −272.16 t.
- Net: 39,580.11 t − 27,962.45 t deductibles = 11,617.66 t.
After loading
- Means of port and starboard: forward 12.320 m, aft 12.600 m, midships 12.490 m; trim between the marks +0.280 m over 218.50 m.
- To the perpendiculars: forward 12.320 m − 0.0019 = 12.318 m; aft 12.600 m + 0.0064 = 12.606 m; midships 12.490 m − 0.0006 = 12.489 m.
- M/M/M: (12.318 + 6 × 12.489 + 12.606) ÷ 8 = 12.483 m; sag 27 mm.
- First trim correction: +0.2883 × +3.46 × 67.40 × 100 ÷ 225.00 = +29.88 t.
- Second trim correction: 50 × 0.2883² × (1026.7 − 1006.7) ÷ 225.00 = +0.37 t.
- Density: (78,832.60 + 29.88 + 0.37) × 1.0200 ÷ 1.025 = 78,478.16 t, a correction of −384.70 t.
- Net: 78,478.16 t − 2,314.50 t deductibles = 76,163.66 t.
Cargo loaded: 76,163.66 t − 11,617.66 t = 64,546.00 t. Constant: 11,617.66 t − 11,250.00 t lightship = 367.66 t.
Formula, assumptions, and limits
A draft survey finds the cargo as the difference between two net displacements, each worked from six draft readings by the sequence on Form “C” of the UN/ECE Draught Survey Code, ECE/ENERGY/19 of 3 February 1992. The code’s Part 1 recommends the procedure “for calculating the weight of dry cargoes at both loading and discharge ports”, so its title’s coal is not a limit on its use.
Formula
- , , : the means of the port and starboard readings at the forward, aft and midship marks, m.
- : trim between the marks, , positive by the stern, m; the length between the forward and aft marks, m.
- : the forward marks’ distance from the forward perpendicular, positive aft of it; the aft marks’ distance from the after perpendicular, positive forward of it; the midship marks’ distance from amidships, positive aft, all m.
- : trim between the perpendiculars, , positive by the stern, m.
- , , : displacement in t, tonnes per centimeter in t/cm and the longitudinal center of flotation from amidships in m, positive aft, all read from the tables at .
- , : moment to change trim one centimeter at plus and minus 0.50 m, t·m/cm.
- : dock water density read in air, t/m³; the density the tables are worked for, usually 1.025 t/m³.
- : the displacement corrected for trim, t.
- : ballast, fresh water, fuel oil, diesel oil, lube oil and other weights aboard, t.
For a discharge the cargo is the net displacement before less the net displacement after.
Derivation
Draft marks are seldom at the perpendiculars, so each mean reading is moved to its perpendicular along the waterline: the trim between the marks over the length between them, times the mark’s distance from the perpendicular. Form “C” lines 133, 140 and 148 give the correction as and leave the sign to “the observation of the slope of the waterplane”; the signed form above gives the same answer for every case. Line 150 then takes the midships draft less the mean of the forward and aft drafts: a positive result is sag, a negative one hog.
The hydrostatic tables give displacement for a ship floating level, so the code reads them at the M/M/M draft of lines 151 and 152, which weights amidships six times for a hull bent into a parabola. A trimmed ship pivots about its center of flotation, not about amidships, so the mean draft is off the true level draft by trim × LCF ÷ LBP; that, times the TPC converted to tonnes per meter, is the first trim correction of line 162. Its sign follows the code’s table: trim by the stern with the LCF forward of amidships is minus. The second correction of line 163, named for Nemoto, allows for the center of flotation moving as the ship trims; the code says it “is always +”.
The density correction of line 167 is written as a difference, (table density − dock density) ÷ table density × displacement, with the sign set by which is larger. The ratio form above gives the same figure in one step.
Assumptions
- The hull bends as a parabola, which the M/M/M assumes (code p. 36). An approved deflection table or a draft survey manual’s own method takes precedence where the ship has one; the code also gives station factors and a waterplane-coefficient factor (pp. 24 and 25) as other methods.
- The table figures are read by linear interpolation at the M/M/M draft (code p. 25), from the ship’s approved hydrostatic data.
- The two MTC figures are read 0.50 m above and below the M/M/M. The code defines them about the mean observed draft (p. 27), which differs from the M/M/M by the corrections for the marks and for deflection.
- The second trim correction is always added (p. 27), so the MTC 0.50 m above must be at least the MTC 0.50 m below; the calculator refuses the two the other way round, which is how they are most often mistyped.
- The dock water density is the average of samples in air, with no temperature correction (code p. 58).
- The ship is upright to within ½° and her trim lies inside her trim correction tables (code pp. 15 and 19).
- Every deductible is measured at the time of the drafts; the calculator takes the figures as entered.
Worked example
The example is constructed for this page; ECE/ENERGY/19 contains no worked example. A ship of 225.00 m between perpendiculars has her forward marks 1.50 m aft of the forward perpendicular, her aft marks 5.00 m forward of the after perpendicular and her midship marks 0.50 m aft of amidships, with tables at 1.025 t/m³ and a lightship of 11,250 t.
| Step | Before loading | After loading |
|---|---|---|
| Mean drafts, forward, midships, aft | 5.220, 6.630, 7.800 m | 12.320, 12.490, 12.600 m |
| At the perpendiculars, forward, midships, aft | 5.202, 6.624, 7.859 m | 12.318, 12.489, 12.606 m |
| Deflection | sag 93 mm | sag 27 mm |
| M/M/M | 6.601 m | 12.483 m |
| Trim between perpendiculars | 2.657 m by the stern | 0.288 m by the stern |
| Table figures at M/M/M | 40,305.2 t; 63.20 t/cm; LCF −6.70 m | 78,832.6 t; 67.40 t/cm; LCF +3.46 m |
| MTC at M/M/M ± 0.50 m | 912.0 and 882.0 t·m/cm | 1,026.7 and 1,006.7 t·m/cm |
| First trim correction | −499.99 t | +29.88 t |
| Second trim correction | +47.06 t | +0.37 t |
| Dock water, density correction | 1.0180 t/m³, −272.16 t | 1.0200 t/m³, −384.70 t |
| Deductibles | 27,962.45 t | 2,314.50 t |
| Net displacement | 11,617.66 t | 76,163.66 t |
The cargo loaded is 76,163.66 − 11,617.66 = 64,546.00 t, and the ship’s constant is 11,617.66 − 11,250.00 = 367.66 t, 3.6% above the 355 t from the ship’s earlier surveys and inside the code’s ±10%. At the code’s 0.5% the cargo lies within ±322.73 t.
Edge cases and limits
At even keel both trim corrections are zero, and the M/M/M is the corrected mean draft. Marks outside a perpendicular take a negative distance. Where the tables are referred to the molded base line, the keel plate thickness comes off the M/M/M before the tables are read (line 153); tables to the underside of the keel need nothing. Outside the hydrometer range of 0.990 to 1.040 kg/l that the code specifies on page 56, the calculator refuses the density. The calculator does not interpolate the tables or store any ship’s data.
Regulatory basis
ECE/ENERGY/19 was adopted by the ECE Working Party on Coal in October 1991 and endorsed by the ECE Committee on Energy in November 1991. Its own background note calls it “a set of recommendations which may be applied in full or in part”. A charter party or sale contract makes the code binding between the parties, and the code’s pages 39 and 40 give a model clause.
Common errors
- An LCF taken from the after perpendicular, as some tables give it, used as if it were from amidships: the first correction then comes out more than ten times too large.
- An LCF from tables that count it positive forward of amidships entered here, where it is positive aft, without changing its sign. The first trim correction of each survey then turns the wrong way, +499.99 t before loading and −29.88 t after it in the worked example: the cargo comes out at 63,493.38 t instead of 64,546.00 t, 1,052.63 t short, and the constant at 1,360.80 t against 355 t.
- The trim between the marks used for the trim corrections, or the trim between the perpendiculars used to move the marks: lines 133 to 141 take the first, lines 162 and 163 the second.
- A density corrected to 15 °C, or a single sample taken at the surface near a river mouth, where fresh water lies over salt (code p. 36).
- The second trim correction dropped at large trim. It grows with the square of the trim: 47.06 t at 2.657 m in the example, 0.37 t at 0.288 m.
- Ballast tanks entered as “full” or “empty” without sounding, which the code rules out on page 30.
Signs of the trim corrections
The first trim correction takes its sign from the trim and the position of the center of flotation, and the second is always added. The table is the code’s line 162 table, with the trim measured between the perpendiculars.
| Trim | LCF forward of amidships | LCF aft of amidships |
|---|---|---|
| By the stern | first correction − | first correction + |
| By the head | first correction + | first correction − |
| Either way | second correction + | second correction + |
Figures the UN/ECE code sets
| Item | Figure | Where in ECE/ENERGY/19 |
|---|---|---|
| Accuracy of a survey to the code | within 0.5% | Part 1, p. 2 |
| Accuracy under proper and favorable conditions | within 0.1% | Part 1, p. 2 |
| Largest list at which drafts are read | ½° | p. 15 |
| Change in the constant that calls for a recheck | ±10% from earlier surveys | p. 42 |
| Hydrometer range | 0.990 to 1.040 kg/l in air | p. 56 |
| Hydrometer graduation | 0.0005 kg/l | p. 56 |
| Decimals for sea water density | four | p. 16 |
| Decimals for drafts and soundings | two | p. 16 |
| Current at the berth below which the code finds no squat | 2.5 knots | p. 36 |
The two-decimal rule is for recording. Rounding the M/M/M to two decimals before reading the tables moves the result: in the example, 12.48 m instead of 12.483 m is worth about 17 t at 67.40 t/cm. The calculator carries every figure at full precision and rounds only what it shows.
Where each figure comes from
The ship’s particulars, the length between perpendiculars and the positions of the draft marks, come from the approved hydrostatic tables and the draft mark plan. The lightship weight is the one in the approved trim and stability booklet.
The drafts are read from a boat or the quay at all six marks, as near the water as possible. The code has the midships drafts determined by measuring the freeboard from the deck line to the water on each side, whether or not the ship has midship marks; the depth that freeboard is taken from is the summer draft plus the summer freeboard on the ship’s International Load Line Certificate.2 The density is read on a certified glass hydrometer, first amidships near the surface and near the keel, then at the bow and the stern: one reading at each end when the two amidships readings agree, two levels at each end when they do not. The density is the average of all the readings (code p. 27).
Deductibles come from sounding every ballast tank, with the ballast’s own density from a sample, and from the chief engineer’s figures for fuel, diesel, lube oil and fresh water, checked against soundings. At the survey after cargo work the code has only the ballast measured again, and the stores taken as the first figures less what was used in port, unless they have been moved or bunkered.
Each centimeter of draft is worth one TPC: on the example’s loaded ship, 67.40 t/cm, or 67.07 t after the density ratio. The hydrometer’s kg/l and the tables’ t/m³ are the same figure, since a tonne is 1,000 kg and a liter a thousandth of a cubic meter.3 A density error of 0.001 t/m³ is worth 76.94 t on the same survey, which is why the code wants four decimals.
Regulatory basis
The UN/ECE Draught Survey Code sets the method as a recommendation to the coal trade, extended by its Part 1 to dry cargoes generally; a charter party or sale contract makes it binding between the parties.1
- Instrument
- UN/ECE, Code of Uniform Standards and Procedures for the Performance of Draught Surveys of Coal Cargoes, ECE/ENERGY/19, 3 February 19921
- Adopted
- ECE Working Party on Coal, October 1991; endorsed by the ECE Committee on Energy, November 19911
- Calculation
- Form “C” lines 129 to 170 for each survey; Form “E” line 380 for the cargo1
- Accuracy
- Within 0.5% to the code’s standard; 0.1% under proper and favorable conditions (Part 1, p. 2)1
- Ship's condition
- Upright, list never over ½°; trim within the ship’s trim correction tables (pp. 15 and 19)1
- Density
- Glass hydrometer read in air, 0.990 to 1.040 kg/l, no temperature correction (pp. 56 and 58)1
- Units
- 1 t = 1,000 kg and 1 L = 0.001 m³, so a density in kg/l is the same figure in t/m³: BIPM SI Brochure, 9th edition, Table 83
- Freeboard
- Midships drafts determined from the freeboard and the depth, the summer draft plus the summer freeboard on the International Load Line Certificate (Load Lines 1966, Annex III)2
What the survey figure leaves out
- Hydrostatic tables. The reader enters the table figures at the M/M/M draft the calculator shows; it stores no ship’s tables and does not interpolate between rows.1
- Deflection. The M/M/M assumes the hull bends as a parabola; a ship with an approved deflection table or draft survey manual uses that instead, and the code also gives station factors and a waterplane-coefficient factor (pp. 24 and 25).1
- List. No list correction is applied, since the code gives none; the list is worked from the port and starboard drafts only to check it against ½°.1
- Trim tables. A ship whose own trim correction tables cover the trim uses them; the formula corrections stand in where the ship has none.1
- Deductibles. The tank figures are taken as entered; the code’s checks on ballast, mud, residual water and unpumpable fuel are the surveyor’s work at the tanks.1
- Shore scales. The code records a shore figure for statistical purposes only and says it should not influence the cargo weight (p. 34); the calculator compares nothing with it.1
How to use this calculator
- Choose loading or discharge, then enter the length between perpendiculars, the distances of the forward, aft and midship marks from their perpendiculars and from amidships, the beam, the table density and the lightship.
- For the survey before cargo work, enter the six drafts read at the marks, port and starboard, forward, midships and aft, and the dock water density from the hydrometer, read in air.
- Read the ship's approved hydrostatic tables at the M/M/M draft the calculator shows: displacement, TPC and LCF there, and the MTC 0.50 m above and 0.50 m below it.
- Enter the deductibles from the tank soundings: ballast, fresh water, fuel oil, diesel oil, lube oil and any others.
- Switch to the survey after cargo work, or show both side by side, and enter the same figures for it, then read the cargo weight, its 0.5% band, the two net displacements and the ship's constant.
Frequently Asked Questions (FAQs)
How is cargo weight calculated by draft survey?
Cargo is the net displacement after loading less the net displacement before, both worked the same way (UN/ECE ECE/ENERGY/19, Form E line 380). Each net displacement is the table displacement at the corrected mean draft, plus the two trim corrections, corrected for the dock water density, less ballast, fuel, fresh water and other deductibles. For a discharge the order is reversed.
What is the quarter mean draft in a draft survey?
The UN/ECE code calls it the mean of the means of the mean draft, M/M/M: the forward and aft drafts at the perpendiculars are averaged, that mean is averaged with the midships draft, and the result is averaged with the midships draft again. It equals (forward + 6 × midships + aft) ÷ 8 and allows for a hull that sags or hogs.
What are the first and second trim corrections?
The first trim correction moves the table displacement from the mean draft to the center of flotation: trim × LCF × TPC × 100 ÷ LBP, with trim in meters and the LCF from amidships. The second, the Nemoto correction, is 50 × trim² × (MTC at +0.50 m − MTC at −0.50 m) ÷ LBP and is always added (ECE/ENERGY/19, pp. 26 and 27). This calculator takes the LCF positive aft of amidships; some hydrostatic tables count it positive forward, so check the sign convention stated with the tables before entering it.
How accurate is a draft survey?
The UN/ECE code says a survey to its standard, with approved ship's data and qualified surveyors, determines cargo weight within 0.5%, and that checks of the same ship by independent surveyors show 0.1% is possible under proper and favorable conditions. On 64,546.00 t that is ±322.73 t and ±64.55 t.
Should the dock water density be corrected for temperature?
No. The code requires the density in air of the water the ship floats in, read on a glass hydrometer amidships near the surface and near the keel and again at the bow and the stern, and warns that correcting it to 15 °C or another standard temperature can lead to very serious errors in the weight (ECE/ENERGY/19, p. 58).
What is the ship's constant?
The constant is the net displacement at the light survey less the lightship weight from the approved trim and stability booklet: the weight of stores, spares, sediment and anything else aboard that is not measured. The code has it recalculated at every survey and treats a value more than 10% from the ship's earlier figures as a sign of an error (ECE/ENERGY/19, pp. 19 and 42).
How is list handled in a draft survey?
By reading both sides and averaging them, and by not surveying a listed ship. The UN/ECE code wants the ship upright and the list never over ½ degree before the drafts are read (ECE/ENERGY/19, p. 15); it gives no list correction. This calculator works the list from the port and starboard drafts and the beam and flags anything over ½°.
What is the difference between the initial and final draft survey?
The initial survey is read before cargo work and the final survey after it, each giving a net displacement from the ship's own tables. The cargo is the difference, since the tables weigh the whole ship and not the cargo. The survey with the ship light, the initial one at a loading port and the final one at a discharge port, also gives the ship's constant: its net displacement less the lightship, checked against earlier surveys.
Why are the draft readings corrected to the perpendiculars?
The tables are worked for drafts at the forward and after perpendiculars and amidships, and the draft marks are seldom there. Each mean reading is moved along the waterline by the trim between the marks over the length between them, times the mark's distance from its perpendicular (ECE/ENERGY/19, Form C lines 133, 140 and 148). On the worked example's ship, trimmed 2.58 m between the marks, aft marks 5 m inside the perpendicular move by 5.9 cm.
What are hog and sag in a draft survey?
The midships draft less the mean of the forward and aft drafts at the perpendiculars: a positive result is sag, the hull bent down amidships, and a negative one hog (ECE/ENERGY/19, Form C line 150). The M/M/M weights the midships draft six times in eight because it assumes the hull bends as a parabola. In the worked example the ship sags 93 mm before loading and 27 mm after.
Which deductibles come off the displacement in a draft survey?
Everything aboard that is not cargo and is measured at the survey: ballast water, fresh water, fuel oil, diesel oil, lube oil and any other liquids. Ballast is sounded tank by tank with its own density from a sample, and the code rules out entering a tank as full or empty without sounding it (ECE/ENERGY/19, pp. 28 to 33). What is aboard and not measured ends up in the ship's constant.
How much does one centimeter of draft change the cargo figure?
One TPC, the tonnes per centimeter immersion from the tables. On the worked example's loaded ship that is 67.40 t/cm, or 67.07 t after the dock water ratio. A draft misread by one centimeter at every mark moves the cargo by that much, which is why the code wants drafts read to the centimeter (ECE/ENERGY/19, p. 16).
What is the keel plate correction?
Where a ship's tables are referred to the molded base line, the drafts read at the marks, which run from the underside of the keel, are greater by the keel plate thickness. The code takes that thickness off the M/M/M before the tables are read (ECE/ENERGY/19, p. 26 and Form C line 153), and calls such tables the relatively unusual case. Tables referred to the underside of the keel need no correction, so the calculator's keel plate field stays at zero for them.
Can a draft survey measure cargo discharged?
Yes. The method is the same, and the cargo discharged is the net displacement before discharge less the net displacement after it (ECE/ENERGY/19, Form E line 380). On this calculator, pressing Discharge on figures entered as a loading swaps the two surveys, so the same cargo shows as discharged.
Does a shore scale weight overrule the draft survey?
Not under the UN/ECE code. It records a shore figure for statistical purposes only and says it should not influence the cargo weight (ECE/ENERGY/19, p. 34, line 383). Which figure is the weight of record between buyer, seller and carrier is set by the charter party or the sale contract, and the code's pages 39 and 40 give a model clause for making the survey binding.
Test cases this calculator passes
Every build of this site runs these cases through the calculator above and stops the release if any figure moves outside its tolerance. Load a case to put its inputs into the calculator.
| Inputs | Expected result | Traced to | Load |
|---|---|---|---|
| Constructed loading survey: LBP 225 m, before 5.22/6.63/7.80 m in 1.0180 t/m³, after 12.32/12.49/12.60 m in 1.0200 t/m³, lightship 11,250 t | Cargo loaded: 64,546.00 tNet before: 11,617.66 tNet after: 76,163.66 tShows “M/M/M 6.601 m”Shows “M/M/M 12.483 m”Ship's constant: 367.66 tShows “±322.73 t” | ECE/ENERGY/19 Form C lines 129 to 170 and Form E line 380, worked by hand: M/M/M (5.2023 + 6 × 6.6241 + 7.8590) ÷ 8 = 6.6007 m; C1 = 2.65675 × −6.70 × 63.20 × 100 ÷ 225 = −499.99 t; C2 = 50 × 2.65675² × 30.0 ÷ 225 = +47.06 t; (40,305.2 − 499.99 + 47.06) × 1.0180 ÷ 1.025 − 27,962.45 = 11,617.66 t; after loading 76,163.66 t; cargo 64,546.00 t; constant 11,617.66 − 11,250 = 367.66 t; 0.5% of the cargo 322.73 t. | Load inputs |
| The same two surveys in reverse: discharge from 76,163.66 t to 11,617.66 t net | Cargo discharged: 64,546.00 tNet before: 76,163.66 tShip's constant: 367.66 t | Form E line 380 for a discharge: net before less net after, 76,163.66 − 11,617.66 = 64,546.00 t; the constant comes from the survey after discharge. | Load inputs |
| Survey after loading read at 12.48 m at all six marks | Shows “M/M/M 12.480 m”Trim corrections after: 0.00 tNet after: 76,133.55 tCargo loaded: 64,515.90 t | At even keel T = 0, so both trim corrections are zero and M/M/M = 12.480 m; 78,832.6 × 1.0200 ÷ 1.025 − 2,314.50 = 76,133.55 t. | Load inputs |
| Both surveys in brackish water at 1.0050 t/m³ | Density correction before: −777.61 tDensity correction after: −1,538.79 tCargo loaded: 63,897.35 t | Density correction Δ2 × (1.0050 ÷ 1.025 − 1): before 39,852.27 × −0.019512 = −777.61 t. | Load inputs |
| Tables to the molded base line, 20 mm keel plate | Shows “M/M/M 6.581 m”Shows “M/M/M 12.463 m”Cargo loaded: 64,546.00 t | Line 153: the keel plate comes off the M/M/M before the tables are read, 6.6007 − 0.020 = 6.5807 m; the table figures entered are unchanged, so the cargo is unchanged. | Load inputs |
The other 7 test cases
| Inputs | Expected result | Traced to | Load |
|---|---|---|---|
| Survey before loading trimmed 4.0 m by the stern between the marks | Trim corrections before: −656.57 tNet before: 11,415.41 tCargo loaded: 64,748.25 t | C2 grows with the square of the trim: T = 4.0778 m gives 50 × 4.0778² × 30.0 ÷ 225 = +110.86 t, against +47.06 t at 2.657 m. | Load inputs |
| Midships drafts 6.45 and 6.81 m before loading, beam 32.26 m | Shows “List 0.64°”Cargo loaded: 64,546.00 t | atan(0.36 ÷ 32.26) = 0.64°, over the ½° of ECE/ENERGY/19 p. 15. | Load inputs |
| Constant from earlier surveys 320 t | Ship's constant: 367.66 tShows “14.9%” | 367.66 against 320: +14.9%, over the ±10% of ECE/ENERGY/19 p. 42. | Load inputs |
| Both LCFs entered with the sign of tables that count positive forward: +6.70 m before and −3.46 m after | Trim corrections before: +547.04 tCargo loaded: 63,493.38 tShip's constant: 1,360.80 t | Both first trim corrections change sign, +499.99 t before and −29.88 t after, while the second corrections stay +47.06 t and +0.37 t; the cargo is 1,052.63 t under the worked example's 64,546.00 t. | Load inputs |
| Discharge chosen on the loading figures | Shows “The net displacement after discharge is more than before. For a loading, choose Loading; otherwise check the two surveys.” | Load inputs | |
| Dock water density 0.95 t/m³ | Shows “Enter the dock water density before cargo work in t/m³ as the hydrometer reads it in air, from 0.9900 to 1.0400 (the code's hydrometer range).” | The code's hydrometer reads 0.990 to 1.040 kg/l (p. 56). | Load inputs |
| MTC figures entered the wrong way round before loading, 882.0 above and 912.0 below | Shows “the two look swapped” | ECE/ENERGY/19 p. 27: the second trim correction is always added, so the MTC 0.50 m above the M/M/M is the larger. | Load inputs |
Change log
Each change to the method, a coefficient or a test case, with the date it reached this page.
- First published, with test cases for the default loading, the same cargo discharged, even keel, a brackish berth, a keel plate, a large trim, a list over ½°, a constant off by more than 10%, and three input errors.
- Worked example LCF moved from 2.10 m to 6.70 m forward of amidships before loading and from 4.24 m forward to 3.46 m aft after it, so it moves aft as the draft increases, as it does on a full-form bulk carrier; ballast before loading lowered from 26,780.20 to 26,439.25 t to keep the constant near 367 t; all example figures reworked, and a test case added for an LCF entered with the wrong sign.
- Dock water sampling restated as the code gives it on p. 27, readings at the bow and the stern in every survey; the density error figure corrected from 76.87 t to 76.94 t per 0.001 t/m³; the brackish berth preset redrawn as the same ship floating deeper, so its constant stays near 358 t; drawings redrawn to keep their text at 12 px or more.
Who publishes this calculator and how it is checked
- Publisher
- ShipCalculators.com, an independent site of maritime calculators.
- How it is checked
- Each figure is traced to the instrument that sets it, and the test cases on this page run against the calculator code on every build; a build that moves one of them does not deploy. Last method check: 22 October 2026.
- What it is not
- Not a survey certificate: the surveyor's readings at the ship, the ship's approved tables and the parties' agreement decide the weight of record.
Calculators used with this one
A list that will not come off with ballast may be a loll, not a list: the angle of loll calculator works the angle from the metacentric height.
Regulation and sources
- UN/ECE, Code of Uniform Standards and Procedures for the Performance of Draught Surveys of Coal Cargoes, ECE/ENERGY/19, 3 February 1992
- IMO, International Convention on Load Lines, 1966, adopted 5 April 1966, in force 21 July 1968
- BIPM, The International System of Units (SI), 9th edition, version 4.01 (2026), Table 8: litre and tonne