ShipCalculators.com

How do you calculate sea time from sign-on and sign-off dates?

Sea service from discharge book dates · both end days counted, each day once · calendar months and odd days, or 30-day months · against the STCW and Indian minimums · Updated 15 October 2026

Published by ShipCalculators.com. Method checked against STCW Regulation I/1 (2010 Manila amendments), MCA MSN 1856 (M+F) Amendment 1 and form MSF 4274, India MS (STCW for Seafarers) Rules 2014 and 46 CFR 10.107 on 15 October 2026. How calculators are checked

Answer

Count every day from sign-on to sign-off, both ends included, and a day on two entries once. Add whole calendar months, then odd days at 30 to the month (STCW Regulation I/1, MCA form MSF 4274). 15 January to 20 June and 20 June to 10 October 2024 give 270 days: 8 months 26 days, or 9 months at 30.

Change the inputs below to recompute.

On this page

What sea service is

Sea service, or sea time, is the time a seafarer has served on board on articles, counted from the date of engagement to the date of discharge, that an administration accepts toward a certificate of competency or its revalidation.3 STCW Regulation I/1 defines seagoing service as “service on board a ship relevant to the issue or revalidation of a certificate or other qualification” and a month as “a calendar month or 30 days made up of periods of less than one month”.1 India’s 2014 STCW Rules, under which the Directorate General of Shipping (DG Shipping) issues Indian certificates, repeat the month in rule 4(31); the US Coast Guard (USCG) and the Australian Maritime Safety Authority (AMSA) count 30 days to the month instead.6,8,10

Total your sea service

Choose how to enter the service: Pick dates for a few entries, one row each, or Paste a list of lines with two dates each, as a spreadsheet or a typed-out discharge book gives them.

One row per discharge book entry. Both the sign-on and the sign-off day count; a day on two entries counts once.

Show the total first as

Sea service 8 months 26 days in calendar months, 270 days, 9 months at 30 days a month

Calendar months · MCA, India

8 months 26 days

30-day months · USCG, AMSA

9 months
Days on articles
270 days
Counted twice, removed
1 day

15 Jan 2024 to 10 Oct 2024 is 270 days of sea service on articles: 8 months 26 days in calendar months, or 9 months at 30 days a month.

STCW II/112 mo

3 months 4 days short of the 12 months of STCW II/1.

Not 269: that drops the sign-on day of each entry.

Not 271: that counts 1 shared day twice.

Choose a view: Timeline draws each entry on a time axis, overlaps hatched; Ledger gives each entry in calendar months and odd days, as MSF 4274 asks; By rule totals the entries under each administration.

Entry 1: 15 Jan 2024 to 20 Jun 2024, 158 daysEntry 2: 20 Jun 2024 to 10 Oct 2024, 113 days, 1 already counted15 Jan 202410 Oct 2024
158entry 1+112entry 2=270days
Each entry in calendar months and odd days
EntryMonthsOdd days
156
2*320
Total8 + 026 → 26

* counted from the day after the earlier entry ends.

The same entries under each administration's month
RuleTotal
UK MCA, MSN 1856; India, 1989 rule 198 months 26 days
USCG, 46 CFR 10.1079 months; 0.75 yr of 360 days
AMSA9 months
Show the working
  1. Entry 1: 15 Jan 2024 to 20 Jun 2024 is 158 days, counting both ends: 5 months and 6 odd days.
  2. Entry 2: 20 Jun 2024 to 10 Oct 2024 is 113 days, counting both ends; 1 of them already counted, so from 21 Jun 2024, 112 days: 3 months and 20 odd days.
  3. Odd days: 26 = 0 months and 26 days at 30 to the month, so 8 + 0 = 8 months and 26 days.
  4. At 30 days a month: 270 ÷ 30 = 9 months, remainder 0 days.

What this total means

Your 2 entries cover 270 days on articles between 15 Jan 2024 and 10 Oct 2024, counting the sign-on and the sign-off day. In calendar months and odd days, the method of the MCA's MSN 1856 and of India's 1989 engineer examination rules, that is 8 months 26 days; at 30 days a month, the USCG and AMSA method, it is 9 months.

The two totals differ because a calendar month is 28 to 31 days long while the other method fixes it at 30. Quote the one your administration uses.

1 day appears on two entries, usually a sign-off and a sign-on on the same date. Added as entered, the entries come to 271 days; a day served once counts once.

For deck officer of the watch, 500 GT or more, STCW II/1 asks 12 months, in an approved training program with a training record book, or 36 otherwise; 6 of them on bridge watchkeeping. Your total is 3 months 4 days short, if all of it was served in the capacity and on the ships the regulation names.

Cite or share this calculation

ShipCalculators.com, “Sea Service Time Calculator.” Method: inclusive days per discharge book entry, each day counted once; calendar months and odd days with odd days at 30 to the month (MSF 4274), and days ÷ 30 (46 CFR 10.107). Entries: 15 Jan 2024 to 20 Jun 2024; 20 Jun 2024 to 10 Oct 2024. Result: 8 months 26 days in calendar months; 270 days, 9 months at 30 days a month. https://shipcalculators.com/calculators/sea-service.

The citation names ShipCalculators.com as publisher; copying it adds today's date.

Your total against each certificate

Your 8 months 26 days by the calendar, against the minimum months of sea service in STCW and in India's MS (STCW for Seafarers) Rules 2014.

  • Rating, navigational watchSTCW II/4: 6 months, or 2 with special training. India rule 33: 15 months, or 6 with pre-sea training.STCW 6 months: metIndia 15 months: 6 months 4 days short
  • Able seafarer deckSTCW II/5: 18 months, or 12 with approved training, while qualified as a watch rating. India rule 34: the same.STCW 18 months: 9 months 4 days short
  • Deck officer of the watch, 500 GT or moreSTCW II/1: 12 months, in an approved training program with a training record book, or 36 otherwise; 6 of them on bridge watchkeeping. India rule 20: the same.STCW 12 months: 3 months 4 days short
  • Chief mate, 3,000 GT or moreSTCW II/2: 12 months, as officer of the watch. India rule 21: 18 months, on 500 GT or more, 6 of them as officer of the watch on 3,000 GT or more.STCW 12 months: 3 months 4 days shortIndia 18 months: 9 months 4 days short
  • Master, 3,000 GT or moreSTCW II/2: 36 months, or 24 if 12 were served as chief mate. India rule 22: 36 months, or 30 if 12 were served as chief mate on 3,000 GT or more, or pro rata.STCW 36 months: 27 months 4 days shortIndia 36 months: 27 months 4 days short
  • Rating, engine-room watchSTCW III/4: 6 months, or 2 with special training. India rule 46: 15 months, or 6 with pre-sea or special training.STCW 6 months: metIndia 15 months: 6 months 4 days short
  • Able seafarer engineSTCW III/5: 12 months, or 6 with approved training. India rule 47: the same.STCW 12 months: 3 months 4 days short
  • Engineer officer of the watch, 750 kW or moreSTCW III/1: 12 months, in an approved training program with workshop training, or 36 of combined workshop training and seagoing service otherwise, 30 of them at sea in the engine department; 6 on engine-room watchkeeping. India rule 35: the same.STCW 12 months: 3 months 4 days short
  • Second engineer, 3,000 kW or moreSTCW III/2: 12 months, as a qualified engineer officer. India rule 36: the same.STCW 12 months: 3 months 4 days short
  • Chief engineer, 3,000 kW or moreSTCW III/2: 36 months, or 24 if 12 were served as second engineer. India rule 37: 36 months, or 30 if 12 were served as second engineer, or pro rata.STCW 36 months: 27 months 4 days shortIndia 36 months: 27 months 4 days short
  • Electro-technical officerSTCW III/6: 6 months, at sea, within 12 months of combined workshop training and seagoing service, or 30 at sea within 36 months of combined training and service otherwise. India rule 48: the same.STCW 6 months: met

The comparison takes the whole total. Each regulation counts only service in a stated capacity, on ships over a stated tonnage or propulsion power, and the shorter alternatives need an approved training program or a training record book.

Counting sea time by hand

For each entry in the discharge book, subtract the sign-on date from the sign-off date and add one, so both days count.3,7 Where two entries share a date, count that day once. For the calendar total, find each entry’s whole months, a month running from a date to the day before the same date next month, then add every entry’s leftover days together and turn each 30 of them into a month.5 For a USCG or AMSA total, divide all the days by 30.8,10

Formula, assumptions, and limits

Two discharge book entries, 15 January to 20 June 2024 and 20 June to 10 October 2024, come to 270 days on articles once 20 June is counted once: 8 months 26 days in calendar months, or 9 months at 30 days a month. Both figures are correct; which one an application needs depends on the administration that issues the certificate.

Formula

Di=Ei−Si+1D_i = E_i - S_i + 1Si′=max⁡(Si, Ci−1+1)S'_i = \max\left(S_i,\ C_{i-1} + 1\right)D=∑i(Ei−Si′+1)D = \sum_i \left( E_i - S'_i + 1 \right)Mcal=∑iki+⌊O30⌋M_{\text{cal}} = \sum_i k_i + \left\lfloor \frac{O}{30} \right\rfloordcal=O mod 30d_{\text{cal}} = O \bmod 30M30=⌊D30⌋M_{30} = \left\lfloor \frac{D}{30} \right\rfloord30=D mod 30d_{30} = D \bmod 30
  • SiS_i, EiE_i: sign-on and sign-off date of entry ii, with the entries sorted by sign-on date.
  • DiD_i: days of entry ii as written, both ends included.
  • Ci−1C_{i-1}: the latest sign-off date among the entries before ii.
  • Si′S'_i: the first day entry ii counts, the day after Ci−1C_{i-1} where the entries overlap, so no day is counted twice.
  • DD: days on articles, each calendar day once.
  • kik_i: whole calendar months in the counted part of entry ii, a calendar month running from a date to the day before the same date in the next month.
  • oio_i: odd days left in entry ii after its whole months, and OO the sum of oio_i over all entries.
  • McalM_{\text{cal}}, dcald_{\text{cal}}: months and days by the calendar.
  • M30M_{30}, d30d_{30}: months and days at 30 days to the month.

Derivation

STCW Regulation I/1, as amended at Manila in 2010, defines a month as “a calendar month or 30 days made up of periods of less than one month”. The calendar method follows that sentence literally: whole months are taken as calendar months, and only the remainders, the periods of less than one month, are counted in days and turned into months at 30. The UK Maritime and Coastguard Agency (MCA) gives the working example in form MSF 4274, 3 January to 5 March as 2 months and 3 days, and adds that odd days “should be added together and reckoned at 30 days to the month”. India’s 1989 engineer examination rules, rule 19, set out the same sequence: complete calendar months first, then the odd days, and the day the articles commence and the day they terminate “shall both be included”.

The 30-day method drops the calendar. The USCG writes it into 46 CFR 10.107 as “Month means 30 days” and “Year means 360 days”, and AMSA publishes the same division with the example 27 + 30 = 57 days, 1 month and 27 days.

Assumptions

  • Every day from sign-on to sign-off is counted; the calculator has no way to mark leave taken inside an entry.
  • A day on two entries, usually a sign-off from one ship and a sign-on to the next on the same date, is served once and counted once.
  • Days between entries are ashore and not counted.
  • The calendar method is applied to each entry and the odd days pooled across all entries, the way MSF 4274 asks for a length per voyage.
  • Dates are calendar dates. A USCG or AMSA day is 8 hours of work, so an hour-based count needs the hours, not the dates.

Worked example

  1. Entry 1, 15 January to 20 June 2024: 17 + 29 + 31 + 30 + 31 + 20 = 158 days, February 2024 having 29. By the calendar, 15 January to 14 June is 5 months; 15 to 20 June are 6 odd days.
  2. Entry 2, 20 June to 10 October 2024: 113 days as written. 20 June is already on entry 1, so the entry counts from 21 June: 112 days. 21 June to 20 September is 3 months; 21 September to 10 October are 20 odd days.
  3. Days on articles: 158 + 112 = 270.
  4. Calendar: 5 + 3 = 8 months, and 6 + 20 = 26 odd days, under 30, so 8 months 26 days.
  5. At 30 days: 270 ÷ 30 = 9 months exactly.

Measured against STCW Regulation II/1, 12 months for officer of the watch, the calendar total is 3 months 4 days short and the 30-day total 3 months short.

Edge cases and limits

A calendar month is 28 to 31 days long, so the two methods drift apart as the service grows: 1 February to 31 July 2025 is 6 months by the calendar and 181 days, 6 months 1 day, at 30. February alone shows it best: 1 to 28 February 2023 is a whole calendar month of 28 days, and 0 months 28 days at 30. A sign-on on the 29th, 30th or 31st of a month followed by a shorter month has no “same date next month”; this page takes that month’s last day as the date, as Excel’s EDATE function does, so 31 January to 28 February 2024 is one month. In 2023, with February ending on the 28th, the month from 31 January ends on 27 February, and 31 January to 28 February 2023 is one month and one day. No administration’s text settles that case.

Regulatory basis

STCW Regulation I/1 sets the month; the sea service minimums are in Regulations II/1 to II/5 and III/1 to III/6, in the text of the 2010 Manila amendments, which Directive (EU) 2022/993 reproduces for the EU. The counting rules are each administration’s: MSN 1856 (M+F) Amendment 1, section 9.2, and MSN 1857 (M+F) Amendment 1, section 4.2, for the UK; India’s MS (STCW for Seafarers) Rules 2014, rule 4(31), for the month; 46 CFR 10.107 and 10.232 for the US. The IMO’s review of the STCW Convention and Code, under way at the Sub-Committee on Human Element, Training and Watchkeeping, gives 2029 to 2030 as its target.

Common errors

  • Counting sign-off minus sign-on. The default entries give 157 + 112 = 269 days that way, one short: each entry loses its sign-on day, and only 15 January was not already counted on the other entry.
  • Adding two entries that share a day. The default entries add to 271 as written; 20 June is one day on board, not two.
  • Dividing by 30 for an MCA application. 270 days is 9 months at 30 but 8 months 26 days by the calendar, and MSF 4274 asks for calendar months and days.
  • Counting standby or yard time in full. MSN 1856 Amendment 1, section 9.3, caps it at 2 months toward a deck certificate needing 12 months or more.
  • Reading the total as service in the right capacity. Chief mate under STCW Regulation II/2 needs 12 months as officer of the watch, not 12 months on board in any rank.

How each administration counts a month

Administration and sourceDayMonth
IMO: STCW Regulation I/1Not definedCalendar month, or 30 days made up of periods under a month
UK MCA: MSN 1856 A1 9.2, MSN 1857 A1 4.2, MSF 4274Date of engagement to date of dischargeCalendar month; odd days added at 30 to the month
India DG Shipping: 2014 Rules rule 4(31), 1989 rules rule 19Both end days of the articles includedCalendar month; odd days at 30 to the month
USCG: 46 CFR 10.1078 hours of watchstanding or day-working30 days; year of 360 days
AMSA: sea service guidance8 hours of work in 24 hours30 days

The two methods part company on short months and long runs. 1 to 28 February 2023 is one calendar month on 28 days, while 1 to 30 March is 30 odd days by the calendar, pooled into one month. Twelve unbroken calendar months are 365 or 366 days, 5 or 6 more than the USCG’s 360-day year.

Where India’s 2014 Rules ask more than STCW

India’s Merchant Shipping (STCW for Seafarers) Rules 2014, G.S.R. 546(E) of 30 July 2014, which the Directorate General of Shipping (DG Shipping) applies to every Indian certificate of competency, raise the convention minimum for five certificates:

  • Chief Mate (foreign-going), rule 21: 18 months on ships of 500 GT or more, 6 of them as officer of the watch on 3,000 GT or more, against 12 months in STCW Regulation II/2.
  • Master (foreign-going), rule 22: 36 months, reduced to 30 with 12 months as chief mate, or pro rata, where STCW Regulation II/2 reduces it to 24.
  • Rating forming part of a navigational watch, rule 33: 15 months, or 6 with pre-sea training, against 6 or 2 in Regulation II/4.
  • Rating forming part of an engine-room watch, rule 46: 15 months, or 6 with pre-sea or special training, against Regulation III/4’s 6 or 2.
  • Chief engineer, rule 37: 36 months, reduced to 30 with 12 months as second engineer, or pro rata, against 24 in Regulation III/2.

The draft MS (STCW for Seafarers) Rules 2026, published by the Ministry of Ports, Shipping and Waterways under the Merchant Shipping Act, 2025, keep the 18 months for chief mate and the 15 for a navigational watch rating, and add “‘Year’ means a calendar year”. The draft carries no G.S.R. number and is not in force.

What counts as sea service

The total is only as good as the days fed into it. The MCA counts service on merchant ships of at least 24 m load line length or 80 GT proceeding to sea, and wants 6 months of it within the 5 years before the application reaches it (MSN 1856 Amendment 1, sections 9.2 and 9.3). For engineers, 75% of the required service must be on a ship under way on sea passage (MSN 1857 Amendment 1, section 4.3), and on ships that use the main engine only now and then, each day under way counts 1.5 times, never more than the time under the crew agreement (section 5.1).

The USCG credits Great Lakes service day for day toward an oceans or near-coastal endorsement, other inland service day for day up to half the requirement, and, on vessels that do not get under way, deck service at three days for one up to 6 months (46 CFR 10.232(b) and (e)).

Where to find each input

The sign-on and sign-off dates are in the continuous discharge certificate (CDC) or seaman’s book, stamped at each engagement and discharge, and in the crew agreement or articles of agreement. Use those dates, not the dates of joining travel or of arriving home: the MCA reckons from engagement to discharge. Where a company testimonial gives the service, its dates should match the discharge book; MSF 4274 asks for the length of each voyage in calendar months and days, which is the per-entry figure in the working under the calculator.

Your entries counted step by step

  1. Entry 1: 15 Jan 2024 to 20 Jun 2024 is 158 days, counting both ends: 5 months and 6 odd days.
  2. Entry 2: 20 Jun 2024 to 10 Oct 2024 is 113 days, counting both ends; 1 of them already counted, so from 21 Jun 2024, 112 days: 3 months and 20 odd days.
  3. Odd days: 26 = 0 months and 26 days at 30 to the month, so 8 + 0 = 8 months and 26 days.
  4. At 30 days a month: 270 ÷ 30 = 9 months, remainder 0 days.

Entries are taken in order of sign-on; a later entry starts the day after the last day already counted.

What the total does not check

  • Capacity, tonnage and power. The total takes every day entered. Each STCW regulation counts only service in a stated capacity on ships of a stated gross tonnage or propulsion power: chief mate on 3,000 GT or more needs 12 months as officer of the watch under Regulation II/2.2
  • Standby, yard and lay-up. The MCA caps standby, dry-dock and repair time at 2 months toward a deck certificate needing 12 months or more, and lay-up or dry dock at 25% or 3 months, whichever is less, for second and chief engineer; the calculator applies no cap.3,4
  • Hours. A USCG or AMSA day is 8 hours of work, not a calendar date, and the USCG 1.5-day credit applies only under 46 CFR 10.232(h); the calculator counts calendar dates.8,9,10
  • Recency. The MCA wants 6 months of the service within the 5 years before it receives the application; the calculator does not compare the dates with today.3
  • Leave and travel. Every day between sign-on and sign-off is counted. Where an administration does not count leave taken inside an entry, split that entry in two around the leave.
  • Month ends. For a sign-on on the 29th to 31st followed by a shorter month, the page takes that month’s last day as the same date, as Excel’s EDATE does; no administration’s text settles the case.

Regulatory basis

STCW sets what a month is and how many months each certificate needs; each administration sets how a day is counted and how odd days are converted.1,2

Month
A calendar month or 30 days made up of periods of less than one month, STCW Regulation I/1, 2010 Manila text1; same words in Directive (EU) 2022/993, Article 12
Minimums
STCW Regulations II/1 to II/5 and III/1 to III/6, as reproduced in Directive (EU) 2022/993, Annex I2
UK
Reckoned from the date of engagement to the date of discharge, MSN 1856 (M+F) Amendment 1 section 9.2 and MSN 1857 (M+F) Amendment 1 section 4.23,4; 3 January to 5 March = 2 months and 3 days, odd days at 30 to the month, MSF 4274 Revision 06/265
India
Month as STCW, MS (STCW for Seafarers) Rules 2014, G.S.R. 546(E) of 30 July 2014, rule 4(31)6; both end days included and odd days at 30 to the month, 1989 engineer examination rules, rule 197
USCG
Day of 8 hours, month of 30 days, year of 360 days, 46 CFR 10.1078; 12-hour day as 1.5 days only on two-watch vessels and MARAD training ships, 46 CFR 10.232(h)9
AMSA
A day is 8 hours of work in 24 hours; 30 days = one month10
Next change
IMO review of the STCW Convention and Code, target 2029 to 203011; India’s draft STCW Rules 2026, not in force12

Frequently Asked Questions (FAQs)

How do you calculate sea time?

Take each discharge book entry from the sign-on date to the sign-off date with both days included, count a day on two entries once, and add up the days. In calendar months, take each entry's whole months and add all the odd days together at 30 to the month, as the MCA's form MSF 4274 does: 3 January to 5 March is 2 months and 3 days. For the USCG or AMSA, divide the days by 30.

Are the sign-on and sign-off days both counted in sea service?

Yes. The MCA reckons seagoing service from the date of engagement to the date of discharge (MSN 1856 Amendment 1, section 9.2), and its example in MSF 4274, 3 January to 5 March as 2 months and 3 days, works only with both days counted. India's 1989 engineer examination rules, rule 19, say the first and last days of the articles shall both be included. Sign-off minus sign-on loses a day per entry.

How many days is one month of sea service?

Under STCW Regulation I/1, a month is a calendar month, or 30 days made up of periods of less than one month. So a whole calendar month counts as one month whether it has 28 or 31 days, and odd days are pooled at 30 to the month. The USCG fixes a month at 30 days and a year at 360 days in 46 CFR 10.107, and AMSA also counts 30 days to the month.

How much sea time is needed for second mate?

STCW Regulation II/1 asks 12 months of approved seagoing service in an approved training program documented in a training record book, or 36 months otherwise, with 6 months of bridge watchkeeping either way, for officer of the watch on ships of 500 GT or more. India's MS (STCW for Seafarers) Rules 2014, rule 20, set the same 12 or 36 months for Second Mate (foreign-going).

How much sea service is needed for chief mate in India?

18 months on ships of 500 GT or more, of which 6 months as officer of the watch on ships of 3,000 GT or more, under rule 21 of India's MS (STCW for Seafarers) Rules 2014. STCW Regulation II/2 asks only 12 months as officer of the watch for chief mate on ships of 3,000 GT or more, so an Indian candidate needs 6 months more than the convention minimum.

Does standby or shipyard time count as sea service?

Partly, and the cap depends on the administration. The MCA accepts at most 2 months of standing by a new ship, dry dock or repairs toward a deck certificate that needs 12 months or more (MSN 1856 Amendment 1, section 9.3). For second and chief engineer it accepts lay-up, maintenance berth, extended anchorage or dry dock up to 25% of the service or 3 months, whichever is less (MSN 1857 Amendment 1, section 4.3).

Is a year of sea service 360 or 365 days?

It depends on the method. The USCG counts a year as 360 days in 46 CFR 10.107. In calendar months, 12 months from a sign-on date is a calendar year, 365 or 366 days, so the same service can be 12 months by the calendar and 12 months 5 days at 30 days a month.

Does the USCG count a 12-hour day as 1.5 days of sea service?

Only in two cases. Under 46 CFR 10.232(h), a 12-hour working day may count as 1.5 days on vessels authorized to run a two-watch system under 46 U.S.C. 8104 and 46 CFR 15.705, and for cadets on MARAD training ships. Elsewhere a USCG day is 8 hours of watchstanding or day-working, overtime excluded, and more hours in the day do not add credit.

How do you calculate sea time in Excel?

With the sign-on date in A2 and the sign-off date in B2, the days are =B2-A2+1. The whole calendar months are =DATEDIF(A2,B2+1,"m") and the odd days =B2+1-EDATE(A2,DATEDIF(A2,B2+1,"m")). Total the odd days of all rows, add =INT(odd/30) to the months and keep =MOD(odd,30) as days. Remove by hand any day shared by two rows. DATEDIF counts a month only once the end day reaches the start day, so for a sign-on on the 29th to 31st followed by a shorter month it gives one month fewer than this page; check those rows by hand.

How to use this calculator

  1. Enter the sign-on and sign-off date of the first discharge book entry, exactly as the continuous discharge certificate or the crew agreement shows them.
  2. Add one row for each further entry with Add an entry, or choose Paste a list and paste the discharge book, one entry a line with its two dates, day first. The order does not matter; the calculator sorts the entries, and a day that appears on two entries is counted once.
  3. Choose the certificate to measure against, or No certificate, and whether the total is shown first in calendar months or in 30-day months.
  4. Read the total in calendar months and odd days, in days on articles and in 30-day months, with the time still needed for the certificate, and check the entry-by-entry working under the calculator.

Test cases this calculator passes

Every build of this site runs these cases through the calculator above and stops the release if any figure moves outside its tolerance. Load a case to put its inputs into the calculator.

InputsExpected resultTraced toLoad
Default, two contractsShows “8 months 26 days”Shows “270 days”Shows “9 months”Shows “3 months 4 days short”Shows “Not 269”Inclusive days 158 + 112 (20 Jun counted once) = 270; calendar 5 m 6 d + 3 m 20 d = 8 m 26 d (MSF 4274 odd days at 30); 270 / 30 = 9 m (46 CFR 10.107); STCW II/1 12 months: 94 days short = 3 m 4 dLoad inputs
MCA example, 3 Jan to 5 MarShows “2 months 3 days”Shows “63 days”MSF 4274 Revision 06/26: 3 January to 5 March = 2 months and 3 daysLoad inputs
Leap FebruaryShows “1 month”Shows “29 days”Shows “11 months short”1 to 29 Feb 2024 is one calendar month on 29 days; 29 / 30 = 0 m 29 dLoad inputs
Sign-on 31 JanuaryShows “1 month 2 days”Shows “31 days”Shows “1 month 1 day”Shows “10 months 28 days short”EDATE convention: 31 Jan to 28 Feb 2024 is one month, 29 Feb and 1 Mar odd days; 31 daysLoad inputs
Entry inside anotherShows “16 months”Shows “488 days”Shows “16 months 8 days”Shows “Meets the 12 months”10 May to 10 Jun 2023 lies inside 1 Mar to 30 Nov 2023 and adds nothing: 275 + 213 = 488 days; 9 + 7 = 16 calendar months; 488 / 30 = 16 m 8 dLoad inputs
The other 4 test cases
InputsExpected resultTraced toLoad
Sign-on 31 January, common yearShows “1 month 1 day”Shows “29 days”Shows “10 months 29 days short”EDATE convention: the month from 31 Jan 2023 ends 27 Feb, the day before 28 Feb, so 28 Feb is one odd day; 29 daysLoad inputs
Target met, chief mateShows “19 months 14 days”Shows “590 days”Shows “19 months 20 days”Shows “Meets the 12 months”590 days; calendar 19 m 14 d meets STCW II/2 12 months and India rule 21 18 monthsLoad inputs
30-day months firstShows “9 months”Shows “270 days”Shows “8 months 26 days”Shows “3 months short”Default entries shown first at 30 days: 9 months; 360 - 270 = 90 days = 3 months short of STCW II/1Load inputs
Sign-off before sign-onShows “is before the sign-on date”An entry whose sign-off is before its sign-on is refusedLoad inputs

Change log

Each change to the method, a coefficient or a test case, with the date it reached this page.

  • First published, with 9 test cases: the default two entries sharing a day, the MCA’s MSF 4274 example, leap February, a 31 January sign-on in a leap year and in a common year, an entry inside another, a met chief mate target, the 30-day view and a refused entry.

Who publishes this calculator and how it is checked

Publisher
ShipCalculators.com, an independent site of maritime calculators.
How it is checked
Each figure is traced to the instrument that sets it, and the test cases on this page run against the calculator code on every build; a build that moves one of them does not deploy. Last method check: 15 October 2026.
What it is not
Not an eligibility assessment by any administration, and not a check that the service was in the capacity, on the ships or within the period a certificate requires.

Regulation and sources

  1. IMO STCW/CONF.2/DC/1, Final Act of the 2010 Manila Conference: STCW Convention annex as amended, Regulation I/1 definitions (text published by the Croatian Ministry of the Sea, Transport and Infrastructure)
  2. Directive (EU) 2022/993 of 8 June 2022 on the minimum level of training of seafarers, OJ L 169, 27.6.2022: Article 1 and Annex I, STCW Chapters II and III
  3. MCA, MSN 1856 (M+F) Amendment 1, UK Requirements for Master and Deck Officers: sections 9.2 and 9.3
  4. MCA, MSN 1857 (M+F) Amendment 1, UK Requirements for Engineer Officers and Engineer Operators: sections 4.2 to 5.1
  5. MCA, form MSF 4274 (Revision 06/26), application for a deck officer oral examination: length of voyage
  6. India, Merchant Shipping (Standards of Training, Certification and Watch-keeping for Seafarers) Rules, 2014, G.S.R. 546(E), Gazette of India, 30 July 2014: rules 4, 20 to 22, 33 to 37 and 46 to 48
  7. India, Merchant Shipping (Examination of Engineer Officers in the Merchant Navy) Rules, 1989, G.S.R. 424(E): rule 19, calculation of qualifying sea service (DG Shipping file, archived copy of 30 June 2022)
  8. US Code of Federal Regulations, 46 CFR 10.107, Definitions in subchapter B: day, month, year
  9. US Code of Federal Regulations, 46 CFR 10.232, Sea service: paragraphs (b), (e) and (h)
  10. Australian Maritime Safety Authority, How to calculate sea service for STCW certificates (updated 20 August 2026)
  11. IMO, Comprehensive review of the STCW Convention and Code: FAQ
  12. India, Ministry of Ports, Shipping and Waterways, draft Merchant Shipping (STCW for Seafarers) Rules, 2026, under the Merchant Shipping Act, 2025