EEXI Required - existing-ship target
Look up the Required EEXI for any existing ship: reference line minus a type-specific reduction factor per MEPC.328(76).
Loading calculator…
Formula, assumptions, and limits
| Symbol | Meaning | Unit |
|---|---|---|
| Compliance target | g CO₂ / (t·nm) | |
| Reference-line coefficients | ||
| DWT or GT | ||
| Type-specific reduction (flat per type) | fraction |
Source: IMO MEPC.328(76)
In short
Compute the Required EEXI for any existing ship - reference line minus type-specific reduction per IMO MEPC.328(76).