ShipCalculators.com

EEXI Required - existing-ship target

Look up the Required EEXI for any existing ship: reference line minus a type-specific reduction factor per MEPC.328(76).

IMODesignMEPC.328(76)
Loading calculator…

Formula, assumptions, and limits

EEXIrequired=aCapacityc(1ZEEXI)\text{EEXI}_\text{required} = a \cdot \text{Capacity}^{-c} \cdot (1 - Z_\text{EEXI})
SymbolMeaningUnit
EEXIrequired\text{EEXI}_\text{required}Compliance targetg CO₂ / (t·nm)
a,ca, cReference-line coefficients
CapacityCapacityDWT or GT
ZEEXIZ_\text{EEXI}Type-specific reduction (flat per type)fraction

Source: IMO MEPC.328(76)

In short

Compute the Required EEXI for any existing ship - reference line minus type-specific reduction per IMO MEPC.328(76).

Learn the theory BIMCO CII and Emissions Clauses