Gibraltar (GI) - Port Card
Gibraltar, GI - annual throughput ~80,000 TEU, max draft 11 m. Bunker hub.
Loading calculator…
Formula, assumptions, and limits
| Symbol | Meaning | Unit |
|---|---|---|
| Draft allowed at berth | m |
Source: Gibraltar Port Authority
In short
Gibraltar, GI — annual throughput ~80,000 TEU, max draft 11 m.