Extended Operational and Trade Vocabulary
Project Cargo Forwarders and Heavy Transport glossary
The project-forwarding and heavy-transport vocabulary: abnormal indivisible loads and their notification, route engineering and escort planning, above-deck stowage of project units, and the multimodal heavy-transport and SPMT terms. Grounds each term in the heavy-transport operation or the abnormal-load regulation it belongs to.
567 defined terms.
Showing 250 on this page (page 1 of 3).
A
- ABLE (Abnormal Load Engineers)
- UK specialist consultancy for road oversize and abnormal load route engineering and escort planning.
- Abnormal Indivisible Load (AIL)
- UK regulatory term for a road load that cannot be divided and exceeds standard construction and use limits.
- Abnormal Load Notification
- Statutory advance notice filed with police, bridge owners, and highway authorities before moving an oversize unit.
- Above Deck Stowage
- Placement of project cargo on the weather deck of a heavy lift vessel for oversize or hazardous units.
- Acceptance Survey
- Inspection on delivery of a newbuild or chartered vessel confirming compliance with contract specifications.
- Acceptance Test Certificate
- Manufacturer document confirming a project unit has passed factory acceptance testing before dispatch.
- Access Road Survey
- Field study of the haul route to identify width, gradient, and overhead obstructions.
- Accompanying Engineer
- Forwarder or carrier engineer who travels with the cargo to oversee handling at each interface.
- Activity Network
- Sequenced schedule of every move, lift, and weld required to deliver a project cargo to its foundation.
- Acute Angle Pull
- Sling configuration where the sling leg deviates sharply from vertical, sharply reducing working load limit.
- Adjustable Gooseneck
- Detachable front section of a lowbed trailer that allows the deck to be lowered for loading.
- Aerial Survey
- Drone or helicopter inspection of a haul route or jetty before a major project move.
- Air Bag Lifting
- Use of inflatable bags to raise a load incrementally for cribbing or trailer insertion.
- Air Caster
- Pneumatic film bearing that floats heavy modules across a smooth floor inside fabrication halls.
- Air Charter Broker
- Intermediary who sources outsize freighter capacity such as An-124 or 747F for project shipments.
- Air Ride Suspension
- Trailer suspension that cushions sensitive project cargo such as transformers and turbines.
- Airbus Beluga ST
- Outsize freighter operated by Airbus Transport International, occasionally chartered for project parts.
- ALE Heavy Lift
- UK-based heavy lift and transport contractor acquired by Mammoet in 2020.
- All-Risk Cargo Insurance
- Marine policy covering project cargo against most physical loss or damage perils.
- All-Terrain Crane (AT)
- Wheeled mobile crane combining road mobility with off-road jobsite capability.
- Allcargo Logistics
- Mumbai-headquartered Indian multinational with project, NVOCC, and contract logistics divisions.
- Allowable Axle Load
- Maximum permitted weight per axle on a specified road or bridge segment.
- Alongside Delivery
- Term placing cargo on the quay within reach of the vessel's gear or shore crane.
- Alternative Routing Study
- Comparative evaluation of multiple haul corridors for an oversize move.
- Anchor Point
- Engineered attachment on a vessel deck or transport beam used to secure a project unit.
- Antonov Airlines
- Ukrainian state airline operating the surviving An-124 fleet for project charter work.
- Antonov An-124 Ruslan
- Soviet-designed four-engine heavy freighter widely chartered for outsize project cargo.
- Antonov An-225 Mriya
- Six-engine outsize freighter, the world's largest, destroyed at Hostomel in February 2022.
- Approach Channel Survey
- Bathymetric study confirming draft and width for a heavy lift vessel calling a project berth.
- Approval in Principle (AiP)
- class statement that a novel concept is feasible against applicable rules pending detailed design.
- Arrival notice
- Carrier notice to consignee of cargo arrival.
- As Loaded Plan
- Final stowage drawing reflecting the actual position of each project unit after loading.
- ASME B30.10
- US standard covering hooks used in lifting service.
- ASME B30.20
- US standard for below-the-hook lifting devices such as spreader bars and lifting beams.
- ASME B30.9
- US standard governing the design, inspection, and use of slings for lifting.
- Atlas Air
- US cargo airline operating Boeing 747 freighters used in project charter markets.
- Auxiliary Hoist
- Secondary hoisting mechanism on tandem-lift STS cranes used for trim and list adjustment of the headblock.
- Average Adjuster
- independent professional who prepares general average and complex particular average statements.
- Axle Line
- One transverse row of wheels on an SPMT, typically rated 36 to 48 tonnes payload.
- Axle Load Calculation
- Engineering computation distributing a project unit's weight across trailer axles for permitting.
B
- Back Up Crane
- Secondary crane positioned on standby during a critical project lift.
- Bagger 288
- Krupp-built bucket-wheel excavator of about 14,200 tonnes, one of the largest mobile land machines ever transported.
- Ballast Tractor
- Heavy prime mover with rear ballast box used to push or pull modular trailers.
- Ballasting Operation
- Adjusting vessel ballast water to keep deck level during heavy lift loading or discharge.
- Bansard International
- Paris-based forwarder with a recognized project cargo division across Africa and Asia.
- Barge Loading
- Use of a flat-deck barge to receive a project unit before transfer to a seagoing vessel.
- Barge Ramp
- Hinged steel ramp linking quay to barge deck for roll-on roll-off project moves.
- BBC Logistics
- Bremen-based project freight forwarder, organizationally separate from BBC Chartering.
- BBM Logistics
- Wuppertal-headquartered German forwarder with project and BBM Akustik acoustic divisions.
- Beam Wagon
- Specialized trailer with a central girder beam used for vessels, columns, and tanks.
- Below-the-Hook Lifting Device
- Any rigging assembly attached between the crane hook and the load, governed by ASME B30.20.
- Bend Radius
- Minimum curvature a wire rope or sling may follow without losing capacity.
- Bertling Logistics
- Hamburg-based project forwarder founded in 1865, active in offshore wind and power generation.
- BIFA
- British International Freight Association, the UK trade body for freight forwarders.
- Big Carl
- Operating name of the Sarens SGC-250 ring crane deployed at Hinkley Point C.
- BIMCO Heavycon
- standard charterparty form used for heavylift project cargoes.
- BL Notation Heavy Lift
- Bill of lading remark identifying a unit as oversize requiring special handling.
- Block and Tackle
- Multi-sheave rigging arrangement that multiplies pulling force for project lifts.
- Boiler Drum Lift
- Tandem lift of a steam drum onto a power plant boiler structure.
- Bollore Logistics
- French forwarder rebranded as CMA CGM Logistics after the 2024 acquisition.
- Bolster
- Container support structure on flat racks that must accommodate proper IMDG securing of dangerous goods.
- Boom Hoist
- Mechanism on an STS crane that raises the seaward boom to vertical when not working to allow vessel passage.
- Boom Suspension
- Cable or strut system holding the boom at its working angle on a lattice crane.
- Borealis Plant
- Petrochemical complex of the Borealis group, an example consignee of polyethylene reactor modules.
- Bracing
- Internal dunnage securing cargo inside a container against shifting.
- Bridge Crane
- Overhead traveling crane spanning a fabrication bay, used to assemble project modules.
- Bridge Loading Assessment
- Engineering check of a structure's capacity to carry an oversize trailer combination.
- Bridge Segment
- Precast deck or girder unit transported and lifted into place for highway or rail bridges.
- BST Brake Specification
- Documentation of trailer braking performance for heavy haul permitting.
- Bumper Pull
- Light trailer towed from a hitch, contrasted with heavy haul fifth wheel or gooseneck connections.
- Bundle Lift
- Single lift of multiple long items strapped together, common for piping and structural steel.
C
- Cable Reel Transport
- Movement of large drums of high-voltage or umbilical cable using cradles or beam trailers.
- CAD Lift Drawing
- Computer drawing depicting crane geometry, load, and clearances for a project lift.
- Cargo Care Plan
- Documented procedure for monitoring temperature, humidity, and shock during project transit.
- Cargo Manifest Heavy Lift
- Stowage manifest with weights, dimensions, and lift points for each project unit.
- Cargo Securing Manual (CSM)
- Approved manual whose application is verified during lashing surveys.
- Cargolux
- Luxembourg-based all-cargo airline operating Boeing 747-8F freighters in project trades.
- Carrying Beam
- Beam fitted between two trailers to bridge a load that overhangs both decks.
- Catwalk
- Elevated walkway between container stacks, providing access for lashing.
- CC 8800-1 Twin
- Demag crawler crane configuration rated 3,200 tonnes used in refinery and power lifts.
- CC 9800
- Demag 3,200 tonne crawler crane used for refinery columns and wind tower lifts.
- Center of Gravity (CoG)
- Three-dimensional balance point of a project unit, critical for slinging and trailer placement.
- CEVA Logistics
- Marseille-headquartered global forwarder owned by CMA CGM.
- CH Robinson
- Eden Prairie, Minnesota-based third-party logistics provider, the largest in the US by gross revenue.
- Charter Party Heavy Lift
- Contract governing the carriage of project cargo on a chartered heavy lift vessel.
- Chassis Frame
- Main structural frame of a modular trailer carrying axle suspension and load deck.
- Chock
- Mooring fitting that guides a line outboard.
- Civil Works Interface
- Coordination point between the forwarder's delivery and the contractor's foundation works.
- Class Approval
- Verification by a classification society that a lifting or transport arrangement meets relevant rules.
- Clearance Profile
- Cross-section diagram showing minimum overhead and lateral clearance along a haul route.
- CMA CGM Logistics
- Logistics arm of the CMA CGM group encompassing CEVA and former Bollore Logistics.
- Coker Drum
- Tall refinery vessel for delayed coking, often weighing several hundred tonnes per unit.
- Cometto
- Italian manufacturer of self-propelled modular transporters and heavy haul trailers.
- Commissioning Engineer
- Specialist who oversees site assembly and start-up after project cargo delivery.
- Concrete Counterweight
- Cast block used to balance ring cranes such as the SGC-250 during lifts.
- Conjunto Axle Suspension
- TII Group hydraulic suspension architecture used across Scheuerle and Kamag SPMT lines.
- Container Lashing Plan
- Stowage plan showing securing of project cargo with twistlocks and lashings in containers.
- Containerized Heavy Cargo
- Project items shipped inside flat racks or open top containers for liner movement.
- Contingency Plan Heavy Lift
- Documented response to wind exceedance, equipment failure, or load instability during a lift.
- Convoy Movement
- Coordinated road move of multiple oversize trailers under unified escort.
- Cooling Tower Module
- Prefabricated section of a power plant cooling structure shipped as a project unit.
- Counterweight Wagon
- Wheeled wagon supporting the rear counterweight on superlift configurations.
- Crane Mat
- Heavy timber or steel mat distributing crane outrigger or track loads to weak soils.
- Crane Pad
- Engineered foundation for a heavy crane, designed for ground bearing pressure and stability.
- Crane Worldwide Logistics
- Houston, Texas-based forwarder founded in 2008 by former EGL executives.
- Cribbing
- Stacked timber blocks supporting the hull on the keel line and bilge during dock work.
- Critical Lift
- Lift requiring special engineering and management because of weight, value, or hazard.
- Cross Member
- Transverse structural element on a modular trailer connecting two side rails.
- Crown Worldwide Group
- Hong Kong-headquartered moving and logistics company with project and records divisions.
- CSCMP
- Council of Supply Chain Management Professionals, US-based industry body.
- CSS Code
- IMO Code of Safe Practice for Cargo Stowage and Securing.
- Customs Bond Heavy Lift
- Financial guarantee covering duties on project cargo moved under temporary importation.
- Cutting Edge Deck
- Reinforced trailer deck designed to take direct load from heavy steel structures without bolsters.
- Cycle Time Lift
- Total time between crane pickup of a unit and return to ready position for the next lift.
D
- D-Ring
- Forged ring lashing point welded to deck or structure.
- Dangerous Goods Project Cargo
- Project units containing hazardous materials, governed by IMDG and ADR rules.
- Day Rate Crane
- Hire rate charged per calendar day for a mobilized heavy crane.
- DB Schenker
- Hamburg-based logistics arm of Deutsche Bahn with a global project and industrial division.
- Deadweight Capacity Heavy Lift
- Maximum cargo weight a heavy lift vessel can carry to a stated draft.
- Deck Beam Lay Out
- Pattern of cross beams on a heavy lift vessel deck designed to spread point loads.
- Deck Cargo Convention
- IMO instrument covering carriage of deck stowed project cargo.
- Deck Reinforcement Plan
- Drawings showing additional support fitted on a vessel deck for a heavy project unit.
- Deck Strength Drawing
- Vessel plan stating allowable uniform and point loads across the deck.
- Delivery Vessel Window
- Berthing slot reserved at a project site for arrival of a heavy lift vessel.
- Demag CC 2800
- Crawler crane in the 600 tonne class used for power plant and refinery work.
- Demag CC 6800
- Crawler crane in the 1,250 tonne class, also marketed under the Terex brand.
- Demag CC 8800-1
- Crawler crane in the 1,600 tonne class, the basis of the Twin variant.
- Demag TC 3800
- Truck mounted lattice boom crane in the 650 tonne class.
- Departure Survey
- Inspection at origin confirming the project unit and securing arrangements before sailing.
- Detention Heavy Cargo
- Charge levied when project equipment is held beyond agreed free time.
- deugro Engineering Solutions
- In-house engineering arm of deugro providing heavy lift and transport design.
- deugro group
- Frankfurt-based pure project freight forwarder founded in 1924 with about 70 offices worldwide.
- deugro projects Houston
- US specialist division of deugro focused on energy and petrochemical projects.
- Dimensional Drawing
- Scaled drawing of a project unit with all critical dimensions for transport planning.
- Dolly Steering
- Auxiliary steerable trailer placed under the front of a long project load.
- Double Drop Trailer
- Trailer with a low center section providing extra vertical clearance for tall units.
- Down Time Crane
- Hours during which a hired crane is non-productive but still on rate.
- Draft Survey Heavy Lift
- Reading of vessel marks to confirm loaded condition during project cargo operations.
- Drawing Approval Cycle
- Engineering review and sign-off loop between forwarder, contractor, and client.
- Driveway Loading
- Permissible wheel load over a culvert or driveway crossed by a heavy trailer.
- Dropped Object Study
- Hazard analysis of consequences if a project unit falls during lifting.
- DSV A/S
- Hedehusene, Denmark-headquartered global forwarder, with Project Industrial Logistics division.
- Dunnage
- Disposable wood, mats, or air bags used to protect, separate, and chock cargo.
E
- Earth Pressure Plate
- Steel plate used to spread crane outrigger loads on soft ground.
- ECU Worldwide
- Mumbai-based NVOCC subsidiary of Allcargo Logistics, formerly Hellmann Africa in some markets.
- Edge Protection Sling
- Pad or sleeve placed between a sling and a sharp corner to prevent cutting.
- Electric Power Pack
- Battery and motor unit used to drive SPMTs without diesel emissions.
- End Beam Cargo
- Project unit, often a vessel section, with lifting and supporting points at each end.
- End User Certificate
- Statement of ultimate buyer used in sanctions checks.
- Engineered Lift
- Lift designed using site-specific calculations rather than catalog charts.
- Engineered Transport
- Trailer move designed using axle distribution and route survey calculations.
- Engineering Critical Assessment
- Fitness for service review of a project unit before transport or installation.
- Engineering Drawing Package
- Bundle of arrangement, lifting, and transport drawings issued for a project move.
- Engineering Liaison
- Forwarder engineer who interfaces between manufacturer, contractor, and carrier.
- Engineering Method Statement
- Document setting out step-by-step procedure for a lifting or transport operation.
- Engineering Risk Register
- List of identified risks with mitigation actions for a project move.
- Engineering Survey
- Detailed measurement of equipment and route to support a project lift or move.
- Envision Energy
- Chinese wind turbine OEM whose nacelles and blades are frequent project cargo.
- Equipment Mobilization
- Movement of salvage gear and personnel to a casualty location.
- Escort Vehicle
- Pilot car accompanying an oversize load on the highway for safety and traffic management.
- Estuary Transfer
- Mid-river transfer of project cargo from seagoing vessel to inland barge.
- EU Heavy Goods Permit
- Member state permit authorizing road movement of an abnormal load within the EU.
- Exceedance Wind Speed
- Wind threshold above which a planned lift must be paused.
- Expeditors International
- Seattle, Washington-based forwarder with a project cargo and industrial vertical.
- Expert Witness
- Independent engineer engaged to opine on a heavy lift or transport dispute.
- Export License Project
- Government authorization required for shipment of controlled project equipment.
- External Loadout
- Loading of project modules from quay to vessel using shore equipment rather than ship's gear.
F
- Factory Acceptance Test
- Acceptance testing of new containers at the manufacturer's plant before delivery to lessor or carrier.
- Fairlead
- Fitting that leads a rope in the desired direction without chafe.
- Fall Block
- Multi-sheave hook block carrying the main hoist rope reeving on a heavy crane.
- Fall Protection Plan
- Safety scheme for working at height on project cargo or rigging structures.
- Fast Track Project
- Project where engineering, procurement, and delivery overlap to compress schedule.
- Faymonville
- Belgian manufacturer of modular trailers, beam wagons, and SPMT equipment.
- Faymonville MultiMAX
- Modular semi-trailer family widely used for project and oversize cargo.
- FEED Study
- Front End Engineering Design phase, when project cargo specifications begin to crystallize.
- Ferry Crossing Heavy Cargo
- Use of a roll-on roll-off ferry to bridge a sea or river link in a project route.
- FIATA
- International Federation of Freight Forwarders Associations.
- Field Erection
- Final assembly of a project unit at its installation site after delivery.
- Field joint coating
- In offshore pipelines, coating applied to joints in the field after welding.
- Final Mile Heavy
- Last leg of a project delivery from staging yard to foundation.
- Final Position Survey
- Geodetic check confirming a project unit is set within installation tolerances.
- Five-Wheel Per Side SPMT
- SPMT configuration with five wheel pairs across each axle line for high payload.
- Fixed Lashing
- Lashing arrangement intended to resist load motion in all sea states.
- Flange Up Position
- Orientation of a piping spool or vessel during transport with flanges facing upward.
- Flat Rack Container
- Open-sided container designed for oversize and heavy project cargo.
- Flexitrailer
- Generic term for modular hydraulic suspension trailer families used in project transport.
- Float On Float Off (FLO/FLO)
- Loading method where a floating module is positioned over a semi-submersed vessel.
- Float-out
- Operation removing hull from drydock.
- Floating Sheerleg
- Crane barge with a fixed lattice boom used for heavy lifts in harbor.
- Flue Gas Duct
- Large ducting transported as a project unit for power and refinery installations.
- Forwarding Order
- Contract instruction from shipper to forwarder defining scope of project move services.
- Foundation Bolts
- Anchor bolts cast into foundations onto which a project unit is finally seated.
- Foundation Loading Drawing
- Drawing showing how a project unit's weight transfers to its foundation.
- Frame Trailer
- Heavy trailer with a structural frame replacing a conventional deck for vessels and columns.
- Free On Board Liner Out (FOBLO)
- Cost split where shipper bears costs through loading and carrier through discharge.
- Free Span Bridge
- Bridge with a single unsupported span over which oversize loads require detailed analysis.
G
- GAC Group
- Gulf Agency Company, a global shipping, logistics, and marine services group founded in Kuwait in 1956.
- Gantry Lift
- Lift performed by a portal frame on rails rather than a mobile crane.
- Gas Turbine Lift
- Heavy lift of a power plant or compressor station gas turbine, often above 300 tonnes.
- GE Vernova
- Energy spin off of General Electric encompassing the GE wind turbine business including Haliade-X.
- Generator Stator Transport
- Movement of a large electrical machine stator, frequently 200 to 500 tonnes.
- Geodis
- Paris-headquartered logistics group founded by SNCF in 1991, with a Projects vertical.
- Geodis Projects
- Project industrial division of Geodis covering oil, gas, and renewables.
- Geotechnical Survey Crane
- Soil investigation used to validate ground bearing for a heavy crane setup.
- Girder Bridge Ramp
- Heavy ramp formed of girders used to span a step between quay and vessel.
- Globaliner Project Network
- Independent project forwarder cooperation network with global membership.
- Goldhofer
- German manufacturer of heavy duty and modular trailers including the THP/SL family.
- Goldhofer PST/SL-E
- Self-propelled modular transporter family from Goldhofer.
- Goldhofer THP/SL
- Hydraulic modular trailer system used worldwide for project transport.
- Goldwind
- Chinese wind turbine manufacturer whose nacelles and blades are major project cargo.
- Gondola Wagon
- Open top rail wagon used for steel coils and bulky project components.
- Gooseneck
- Hinged fitting connecting a boom to a mast.
- GPS Tracking Project Cargo
- Real-time location monitoring fitted to high-value project units in transit.
- Granger Loading
- Term sometimes used for end-to-end loading of long project units onto rail.
- Grease Lift
- Lubrication of trailer axles and suspension before a long heavy haul.
- Gross Tonnage Heavy Lift Vessel
- ITC tonnage measure used in port dues for heavy lift carriers.
- Ground Bearing Pressure (GBP)
- Pressure exerted by crane tracks or outriggers on the soil.
- Ground Improvement Pad
- Engineered pad of compacted material to raise bearing capacity for a crane.
- Guide Pin
- Tapered pin used to align a project unit with its foundation during set down.
- Guy Wire
- Tensioned cable supporting a tower crane or temporary structure during lifts.
H
- HAZID
- Hazard Identification workshop used in design and post-casualty review.
- HAZOP
- Hazard and operability study applied to diving system design.
- Heavy & Specialized Transport Carriers Conference (HSTCC)
- North American forum for specialized hauliers and forwarders.
- Heavy Cargo Hook
- Forged hook used on heavy lift cranes, certified per ASME B30.10 or equivalent.
- Heavy Equipment Manager
- Forwarder role responsible for cranes, SPMTs, and ancillary heavy gear on a project.
- Heavy Haul Permit
- Authorization to move an oversize or overweight load over public roads.
- Heavy Lift Code Guidance
- IMO MSC.1/Circ.1353 guidance on shipboard handling of heavy cargo.
- Heavy Lift Concept Study
- Early stage study comparing crane, SPMT, and skidding solutions for a project unit.
- Heavy Lift Insurance
- Marine and project cargo insurance covering oversize units and project moves.
- Heavy Lift Sling Set
- Engineered set of slings sized and certified for a specific project lift.
- Heavy Transport Vehicle (HTV)
- Road combination configured for abnormal indivisible loads.
- Heavy-Lift Vessel (HLV)
- Project-cargo ship with high-capacity cranes.
- Heliport Crane
- Crane positioned to assemble or maintain offshore platform helidecks.
- Hellmann Worldwide Logistics
- Bremen-based global forwarder with project and air freight divisions.
- High Cube Module
- Project module with overall height exceeding standard transport envelopes.
- Hinkley Point C
- UK nuclear power project where the Sarens SGC-250 ring crane is deployed.
- Hoisting Engineer
- Discipline engineer specifying crane configurations and rigging for project lifts.
- Hold On Lashing
- Lashing fitted at sea to hold a project unit firmly against its supports.
- Hook Block Capacity
- Working load limit of a crane's main hook block in a given reeving configuration.
- Hostomel
- Ukrainian airport where the only Antonov An-225 Mriya was destroyed in February 2022.
- Hub City Project Office
- Forwarder office located near a project hub such as Houston, Dubai, or Singapore.
- Hydraulic Climbing Jack
- Strand jack or hydraulic jack used to raise project units in steps.
- Hydraulic Gantry
- Portable lifting system using hydraulic cylinders on legs running on rails.
- Hydraulic Suspension Trailer
- Trailer using hydraulic cylinders rather than mechanical springs, key to SPMT designs.
- Hyundai Glovis
- South Korean logistics company, the captive provider to Hyundai Motor Group.
I
- ID Survey Project Cargo
- Identification survey marking and recording each project piece before shipment.
- IL-76
- Soviet-designed jet freighter operated by Volga-Dnepr, Silk Way, and Maximus Air for project work.
- IMDG Code
- International Maritime Dangerous Goods Code, mandatory under SOLAS VII Part A.
K
- "K"Line Logistics
- Tokyo-based logistics subsidiary of Kawasaki Kisen Kaisha.
- "K"Line Project
- Project cargo branding within the "K"Line Logistics group.