Extended Operational and Trade Vocabulary
Project Cargo Forwarders and Heavy Transport glossary (page 2)
The project-forwarding and heavy-transport vocabulary: abnormal indivisible loads and their notification, route engineering and escort planning, above-deck stowage of project units, and the multimodal heavy-transport and SPMT terms. Grounds each term in the heavy-transport operation or the abnormal-load regulation it belongs to.
567 defined terms.
Showing 250 on this page (page 2 of 3).
I
- IMO MSC.1/Circ.1353
- IMO circular providing guidance on the provision of information on heavy cargoes.
- In-Service Inspection
- Periodic survey of cables and pipelines after commissioning to detect exposures, free spans, or third-party damage.
- Inchcape Project Services
- Project logistics arm of Inchcape Shipping Services delivering port-based project support.
- Inclining Test
- Vessel test confirming stability before loading or after major modification.
- Indivisible Load
- Load that cannot be separated into smaller parts without disproportionate cost or damage.
- Industrial Reach Project Logistics (IRSL)
- Geodis project industrial division branding used in some regions.
- Inland Barge Move
- River or canal leg of a project shipment between sea port and final site.
- Inland Clearance Depot
- Inland customs facility used for clearance of project cargo before final delivery.
- Inspection Hold Point
- Point in a project transport plan where third party inspection must occur before progress.
- Insurance Survey
- A condition or risk inspection commissioned by hull, machinery, or P&I insurers to assess underwriting exposure.
- InterCombi Trailer
- Scheuerle modular trailer family used for heavy and oversize project transport.
- Intermediate Storage Yard
- Yard used to consolidate project cargo between origin works and final voyage.
- Intermodal Heavy Cargo
- Project cargo moving across road, rail, and sea on the same journey.
- Internal Loadout
- Loading of cargo from a quay into a vessel's hold using ship or shore equipment.
- ISO Tank
- Common industry term for a UN portable tank built to ISO 1496/3.
- Issued For Construction Drawing
- Final engineering drawing released to enable site construction and rigging.
J
- Jack and Pack
- Lift method using hydraulic jacks and cribbing to raise a load incrementally.
- Jacking Tower
- Frame of stackable modules within which strand jacks lift a project unit.
- Jackup Rig Deck
- Topside module of a jackup drilling rig, frequently moved as a project unit.
- Jamnagar
- Indian port city in Gujarat with significant LPG import and refining infrastructure, served by VLGCs and MGCs.
- Jazan Refinery
- Saudi Aramco refinery project with major heavy lift and modular cargo movements.
- Jib Extension
- Auxiliary boom fitted to a crane to increase reach at reduced capacity.
- Job Hazard Analysis (JHA)
- Task level safety analysis used on each phase of a project lift or move.
- Joint Engineering Review
- Meeting at which forwarder, carrier, and client align on lift and transport details.
- Joint Inspection
- Survey attended jointly by buyer, seller, and independent surveyor.
- Jumbo Project Cargo
- Industry term for items exceeding standard heavy lift envelopes.
K
- KAMAG Pendel-X
- TII Group SPMT family from KAMAG used for very heavy modular transport.
- Kawasaki Kisen Kaisha
- Parent of "K"Line Logistics, providing liner and project related logistics services.
- Keel Block Plan
- Drydock plan verified before keel laying or undocking.
- Kiln Section
- Large rotating kiln segment shipped for cement and minerals plants.
- Knuckle Boom Crane
- Articulating crane common on PSVs and CSVs.
- Konecranes Engineering
- Engineering services arm of Konecranes supporting heavy industrial lifting.
- Kuehne+Nagel International
- Schindellegi, Switzerland-based global forwarder with a KN Project Freight division.
- Kuehne+Nagel Project Freight
- Dedicated project cargo offering within Kuehne+Nagel.
L
- Lake Charles Cracker
- Sasol ethylene cracker project in Louisiana, a notable heavy module destination.
- Land Survey Heavy Move
- Topographic survey of a haul route to validate trailer combination feasibility.
- Landing Mat
- Heavy mat placed where a project unit will be set down by crane or trailer.
- Lashing Calculation
- Computation showing that fitted lashings can resist expected accelerations at sea.
- Lashing Plan
- Drawing showing lashing arrangement, included in CSM.
- Lattice Boom Crane
- Crane with a trussed boom, the dominant type for very heavy lifts.
- Launch Beam
- Beam used to launch a bridge segment from one pier to the next.
- Liebherr LG 1550
- Lattice boom mobile crane in the 550 tonne class on a wheeled chassis.
- Liebherr LG 1750
- Lattice boom mobile crane in the 750 tonne class.
- Liebherr LR 11000
- Crawler crane in the 1,000 tonne class.
- Liebherr LR 13000
- Crawler crane in the 3,000 tonne class for refinery and nuclear lifts.
- Liebherr LR 1500
- Crawler crane in the 500 tonne class used in industrial and wind work.
- Liebherr LR 1750
- Crawler crane in the 750 tonne class.
- Liebherr LTM 11200-9.1
- Nine-axle all-terrain crane with 1,200 tonne capacity, the largest of its type.
- Lift Director
- Designated person responsible for the conduct of a critical lift on site.
- Lift Plan
- Engineered procedure governing crane selection, rigging, lashing and contingency for heavy-lift operations.
- Lifting Beam
- Below-the-hook device with one or more lift points, used to control sling angles.
- Lifting Frame
- Engineered structure built around wreck section for crane lift.
- Lifting Lug
- Cast or welded fitting on pumps and machinery for crane handling.
- Liner Out Free In (LIFO)
- Term where carrier covers loading and shipper covers discharge of project cargo.
- Liquid Helium Tank Lift
- Cryogenic vessel transport requiring controlled tilt and shock limits.
- LLM Liner Lift Module
- Industry term for liner modules forming part of a project plant package.
- LNG Plant Module
- Prefabricated process module for liquefied natural gas facilities, often above 5,000 tonnes.
- Load Cell
- Sensor measuring force in a sling or jack during a critical lift.
- Load Distribution Beam
- Beam under a project unit that spreads its weight to multiple trailer rows.
- Load Test Certificate
- Document evidencing proof load on cranes and lifting gear.
- Loading Master
- Person directing the loading and securing of cargo aboard a heavy lift vessel.
- Loading Sequence Plan
- Document setting the order and timing of each lift during vessel loading.
- LogProject Network (LPN)
- Independent project forwarder cooperation network.
- LoLo Heavy Lift
- Lift on lift off heavy cargo operation using ship's gear or shore crane.
- Long Tonne Heavy Cargo
- 2,240 pound tonne occasionally used for heavy cargo statements alongside metric.
- Loop Sling
- Endless soft sling used in basket or choker hitches on project lifts.
- Loose Gear
- Slings, shackles, and accessories used between hook and load on a project lift.
- Lowbed Trailer
- Trailer with a low deck between gooseneck and rear bogie for tall loads.
- Lufthansa Industry Solutions
- Group entity providing logistics IT and engineering, often referenced alongside Hellmann.
M
- Main Hoist
- Primary hoisting circuit of a heavy crane carrying the main lift block.
- Mammoet
- Dutch heavy lift contractor with crawler and ring crane fleet, formerly operating Mammoet Salvage.
- Mammoet Engineering
- Engineering arm of Mammoet supporting heavy lift and transport design.
- Mammoet MSG-80
- Ring crane in the Mammoet fleet built for refinery and petrochemical modules.
- Mammoet PTC 200-DS
- Platform Twin-ring Containerized crane with maximum lift capacity of 5,000 tonnes.
- Mammoet PTC 35-DS
- Smaller member of the PTC ring crane family in the Mammoet fleet.
- Mammoet SK Series
- Range of containerized ring cranes used worldwide for heavy modular work.
- Manitowoc 18000
- Crawler crane in the 700 tonne class widely used in US energy projects.
- Manitowoc 31000
- Crawler crane rated 2,300 tonnes for very heavy refinery and nuclear lifts.
- Manitowoc MLC650
- Crawler crane in the 650 tonne class with variable position counterweight.
- Marine Warranty Surveyor (MWS)
- Independent surveyor approving heavy lift and transport operations on behalf of insurers.
- Maximus Air Cargo
- UAE-based operator of Ilyushin Il-76 freighters used for outsize project moves.
- Mechanical Completion
- Milestone confirming a plant or module is fully assembled before commissioning.
- Method Statement Heavy Lift
- Step-by-step written procedure for a planned lift or transport.
- MingYang Smart Energy
- Chinese offshore wind turbine OEM and developer of large rotor platforms.
- Mobile Crane
- Self-propelled crane on tires or tracks used in project work.
- Modular Trailer
- Trailer built from interchangeable axle modules to suit a wide range of loads.
- MOL Logistics
- Container logistics arm of Mitsui O.S.K. Lines providing depot and inland services.
- Movement Order
- Internal forwarder document authorizing a specific project cargo move.
- MSC.1/Circ.1353
- IMO circular providing Revised Guidelines for the Preparation of the Cargo Securing Manual.
N
- Nacelle Lift
- Heavy lift of a wind turbine nacelle onto its tower, typically 70 to 150 tonnes onshore.
- National Industrial Transportation League (NITL)
- US shippers' association engaged in transport policy.
- Net Charter Rate
- Vessel hire rate after deduction of agreed commissions and rebates.
- Nicolas Industrie
- French manufacturer of heavy modular trailers and the Tractomas heavy hauler.
- Nicolas Tractomas TR10
- Heavy haul tractor unit built by Nicolas Industrie for very high tow forces.
- Nordex
- Wind turbine OEM whose project cargo includes nacelles, hubs, and blades.
- Notice Of Apparent Good Order
- Statement that project cargo has been received without visible damage.
- Notification of Readiness Project
- Statement that a vessel or trailer is ready to load or move project cargo.
- NSPI Lifting Frame
- Heavy lifting frame originally developed by NSPI, used in module setting work.
- NVOCC Project
- Non-vessel operating common carrier specializing in project and oversize cargo bookings.
O
- Ocean Engineering Heavy Lift
- Discipline combining naval architecture and rigging for sea transport of project units.
- Off-hire survey
- Joint survey at redelivery.
- Offshore Wind Foundation
- Monopile, jacket, or floater foundation transported and installed as a project unit.
- Offshore Wind Tower
- Tubular tower for an offshore turbine, often delivered in two or three sections.
- Oil Rig Module
- Process or accommodation module fabricated for offshore drilling or production units.
- On-Hire Survey
- Joint survey at delivery into time charter recording condition and bunkers.
- Onboard Lashing
- Securing of project cargo to a vessel using chains, wires, and turnbuckles.
- OOG Cargo
- Out of gauge cargo exceeding standard container or trailer dimensions.
- Open top container
- Container with removable tarpaulin roof.
- Operations Manual Heavy Lift
- Carrier manual describing approved heavy lift procedures and limits.
- Outrigger Pad
- Steel or composite pad placed under crane outriggers to distribute load.
- Overhang Lift
- Lift where the load extends significantly beyond the trailer or vessel deck edge.
- Overhead Line Crossing
- Section of a haul route where the load passes under or near energized lines.
- Oversize Vessel Stowage
- Stowage arrangement allowing cargo wider than the hatch opening on deck.
P
- P&I Cover Heavy Lift
- Protection and indemnity cover including project cargo handling risks.
- Pad Eye
- Welded plate with hole forming a lashing point.
- Panalpina
- Former Swiss forwarder acquired by DSV in 2019, with strong oil and gas project heritage.
- Path Plan Heavy Move
- Detailed path drawing for an SPMT trail through a fabrication yard or jetty.
- Pendant Line
- Wire rope linking boom tip to back stays on a lattice crane.
- Permit Vehicle
- Vehicle moving under special permit due to oversize or overweight dimensions.
- Petrochemical Reactor
- Pressure vessel for catalytic processes, often 500 to 1,500 tonnes per unit.
- Pile Driving Module
- Heavy hammer and frame assembly transported for offshore foundation works.
- Pipe spool
- Prefabricated pipe assembly with flanges and fittings, installed during outfitting.
- Plant Layout Drawing
- Site drawing used to plan delivery, lay down, and lift positions for project units.
- Plate Trailer
- Trailer with a heavy steel deck designed for plate, coil, and slab cargo.
- Platform Twin-ring Containerized (PTC)
- Mammoet platform ring crane family including the PTC 200-DS.
- Polar Air Cargo
- US cargo airline operating Boeing 747 freighters in project related charters.
- Port Captain Heavy Lift
- Operator's representative supervising heavy lift operations at the port.
- Port Survey Heavy Cargo
- Inspection of berth, draft, and shore equipment before a heavy lift call.
- Power Pack Unit (PPU)
- Diesel or electric unit powering hydraulic SPMT and gantry systems.
- Pre-Engineering Study
- Concept study to size cranes, trailers, and route for a project move.
- Pre-Lift Meeting
- On-site toolbox meeting immediately before a critical lift.
- Pre-Lift Study
- Detailed engineering analysis ahead of any major project lift.
- Pre-Shipment Inspection
- Quantity and quality check at production or warehouse before shipment.
- Precast Bridge Segment
- Factory cast deck or pier segment transported and lifted into bridge structures.
- Prime mover
- Engine or turbine driving a generator or propeller.
- Project Cargo Bill of Lading
- Bill of lading marked with detailed measurements, weights, and lashing references.
- Project Cargo Lift Network (PCLN)
- Independent network of project freight forwarders and heavy lift specialists.
- Project Cargo Network (PCN)
- London-headquartered project forwarder network founded in 2010 by Rachel Crawford.
- Project Charter Vessel
- Vessel hired exclusively for the carriage of one or more project units.
- Project Coordinator
- Forwarder role aligning manufacturer, carrier, contractor, and site teams.
- Project Engineer Forwarder
- Engineer within a forwarder responsible for lift and transport design.
- Project Forwarding Contract
- Master agreement between shipper and forwarder for a defined project scope.
- Project Industrial Logistics (PIL)
- DSV project division handling industrial and energy moves.
- Project Logistics Manager
- Senior client or contractor role owning the project supply chain end to end.
- Project Manager Heavy Lift
- Carrier or contractor role overseeing a heavy lift campaign from quote to demobilization.
- Project Movement Plan
- Master plan covering all sequences, routes, and dates for project cargo delivery.
- Project Professionals Group (PPG)
- Independent project freight forwarder cooperation network.
- Project Reefer Cargo
- Project cargo with temperature control needs, such as transformers or insulated modules.
- Project Site Office
- Forwarder office at the construction site supporting day-to-day deliveries.
- Proof Load Test
- Test loading of slings, beams, and frames at a multiple of working load limit.
- Pulling Force Calculation
- Calculation of tractive force required for an SPMT or ballast tractor combination.
Q
- Quay Loading Survey
- Survey verifying that the project quay can support crane and load wheel pressures.
- Quayside crane
- STS or mobile harbour crane on quay.
- Quotation Heavy Lift
- Detailed offer covering vessel, crane, trailer, and engineering for a project move.
R
- Rachel Crawford
- Founder of Project Cargo Network (PCN), established in London in 2010.
- Radial Load Crane
- Force exerted by a crawler crane along the radius from its slewing center.
- Rail Convoy Project
- Coordinated set of rail wagons moving long or heavy project units together.
- Rail Wagon Heavy Duty
- Wagon designed with extra axles and reinforced deck for project cargo.
- Rainfall Hold
- Operational pause on heavy lifts triggered by exceeding rainfall and visibility limits.
- Ramp Crossing
- Junction between two ramps or barge and quay requiring smooth wheel transition.
- Receiving Voyage Plan
- Vessel plan covering loadout, voyage, and discharge of a project consignment.
- Refinery Column
- Tall distillation tower transported as a single project unit, often above 100 meters long.
- Refinery Vessel Hydrocracker
- High pressure refinery reactor, frequently exceeding 1,000 tonnes per unit.
- Reliance Jamnagar
- Indian refinery complex receiving very heavy reactors from international fabricators.
- Reverse Logistics Project
- Movement of decommissioned project equipment back from site for repair or disposal.
- Rigging Engineer
- Engineer specifying slings, shackles, and beams for a project lift.
- Rigging plan
- lift plan for heavy or unusual loads.
- Right of Way Survey
- Confirmation that a road corridor is legally and physically available for a heavy move.
- Ring Crane
- Crane rotating on a large diameter ring of rails, exemplified by SGC-250 and PTC 200-DS.
- Risk Assessment Project
- Documented analysis of risks at each step of a project lift or move.
- Road Survey Heavy Cargo
- Drive through of a haul route with measurement of clearances and surfaces.
- Roll On Roll Off Project
- Loading or discharge of project cargo on wheels rather than by lift.
- Roller Bogie
- Wheeled bogie placed under long project units for short on-deck moves.
- Round Sling
- Endless synthetic sling.
- Route Survey Engineer
- Engineer assessing roads, bridges, and crossings for an oversize move.
- Royale International
- Hong Kong-headquartered logistics group with project and time critical divisions.
S
- Sabetta
- Russian port on the Yamal Peninsula serving Yamal LNG, opened in 2017 and connected via the NSR.
- SACO Shipping
- German consolidator, subsequently integrated within larger logistics groups.
- SAG Mill
- Semi-autogenous grinding mill for mining, frequently 200 to 400 tonnes per shell.
- Sailing Notice Heavy Lift
- Owner's notice confirming heavy lift vessel sailing dates after loading.
- Saint Petersburg Project Hub
- Russian port historically used for heavy lifts to and from Yamal LNG works.
- SANY SCC36000A
- Chinese-built crawler crane in the 3,600 tonne class.
- SANY SCC86000A
- Chinese-built crawler crane in the 8,600 tonne class for very heavy lifts.
- Sarens NV
- Wolvertem, Belgium-based heavy lifting and transport contractor.
- Sarens SGC-120
- Earlier Sarens Giant Crane with 3,200 tonne capacity used worldwide.
- Sarens SGC-250
- Sarens Giant Crane series ring crane with 5,000 tonne capacity, branded Big Carl at Hinkley Point C.
- Sasol Lake Charles
- Petrochemical project in Louisiana whose ethylene cracker required major heavy lift work.
- Saudi Aramco Jazan
- Saudi refinery and IGCC complex receiving large modular cargo shipments.
- Scheuerle
- German manufacturer of modular trailers and SPMT systems within the TII Group.
- Scheuerle InterCombi PowerBooster
- SPMT family from Scheuerle for very heavy modular transport.
- Sea Fastening
- Heavy welded structure securing project cargo for ocean voyage.
- Sea Fastening Engineer
- Engineer designing welded restraints and lashings for project cargo at sea.
- Sea Fastening Removal Plan
- Plan governing cutting and disposal of sea fastening at the discharge port.
- Sealift Convoy
- Coordinated multi-vessel sealift used to move large project cargo programs.
- Seasonal Window
- Time-of-year window dictated by ice, monsoon, or hurricane risk for project shipments.
- Self-Propelled Modular Transporter (SPMT)
- Computer-controlled axle modules used to move very heavy project units.
- Semi-Submersible Heavy-Lift Vessel
- Float-on/float-off transport ship.
- Sevmash
- Russian shipbuilder at Severodvinsk, building nuclear submarines for the Russian Navy.
- SGC-250
- Sarens Giant Crane number 250, the world's largest land-based crane at the time of deployment.
- Shackle Bow
- Curved type of shackle used in slinging arrangements for project lifts.
- Sheer Leg
- Floating crane with fixed jib at fixed radius, used in port heavy lifts.
- Shipside Crane
- Crane on the quay close to the vessel used for project cargo discharge.
- Shock Recorder
- Device fitted to project cargo to record impacts and tilts during transit.
- Shore Power Project
- Provision of shore power for heavy lift vessels during long load or discharge stays.
- Side Loader Trailer
- Trailer that lifts containers from the side, occasionally used for project crates.
- Side Stay Crane
- Lateral stay supporting a crane boom against side loads on heavy lifts.
- Siemens Gamesa Renewable Energy
- Offshore wind turbine OEM with the SG 8.0-167 DD, SG 11.0-200 DD, SG 14-222 DD, and SG 14-236 DD platforms.
- Silk Way Airlines
- Azerbaijan-based cargo airline operating Boeing freighters and historically IL-76s.
- Single Container Multi-Modal
- Term covering project moves planned end to end on a single combined transport document.
- Site Establishment
- Set up of crane pads, access roads, and lay down areas before project lifts.
- Skidding System
- Topside system on pipelay vessels for moving long stalks of pipe across the firing line.
- Slewing Bearing
- Large bearing supporting the rotation of heavy-lift cranes on offshore and MPP vessels.
- Sling Chart
- Reference table giving working load limit at various sling angles.
- Slip Critical Connection
- Bolted joint engineered to resist slipping under design load, common in lifting structures.
- SMI
- Society of Maritime Industries, the UK trade body for marine equipment and services.
- SOLAS Chapter VI Regulation 7
- SOLAS regulation requiring documentation of cargo stowage and securing.
- SOLAS VGM
- Verified Gross Mass requirement under SOLAS VI/2 effective 2016.
- Speed of Lift
- Permitted hoist or slewing speed under a lift plan, often reduced for critical moves.
- Spreader Beam
- Below-the-hook device with two lift points used to keep slings vertical.
- Spud Barge
- A barge fitted with spuds, used for dredging and construction.
- Stability Calculation Vessel
- Calculation showing a heavy lift vessel meets intact and damage stability rules.
- Standard Container Project Cargo
- Project items that fit within ISO container envelopes for liner shipment.
- Standby Crane
- Crane held available on site for contingency support to the main lift.
- Stern Loader Trailer
- Heavy trailer designed for rear loading of project units.
- Stevedoring Heavy Lift
- Cargo handling services on heavy lift vessels at the port of call.
- Stinger Boom
- Sloping rear structure on a pipelay vessel from which pipe descends to the seabed.
- Stowage Plan Project Cargo
- Vessel plan showing exact location of each project unit on deck or below.
- Strand Jack
- Hydraulic jack pulling on bundles of high strength wire strand, used in heavy lifts and parbuckling.
- Strap Down Sea
- Lashing pattern strapping a load directly down to the deck for sea transport.
- Strap Test Certificate
- Document certifying breaking strength of project cargo lashings.
- Structural Engineer Heavy Lift
- Engineer responsible for structural integrity of cargo and supports during a lift.
- Stuffing Heavy Cargo
- Loading of project items into containers under engineering supervision.
- Submerged Loading
- Loading by submerging a semi-submersible heavy lift vessel under a floating module.
- Substation Module
- Prefabricated electrical substation transported as one or more project units.
- Subsupplier Coordination
- Forwarder management of multiple fabricator deliveries into a single project program.
- Superlift Counterweight
- Movable counterweight attached to heavy crawler cranes to extend lift capacity.
- Supervisor Heavy Lift
- Person directing crane and rigging crews during a project lift.
- Survey Report Heavy Lift
- Surveyor's record of condition, lashings, and operations on a project shipment.
- Sway Brace
- Diagonal brace fitted between project cargo and supports to resist transverse motion.
- Swing Out Lift
- Lift where the load travels beyond the crane tail swing during slewing.
T
- Tadano FAUN ATF 600G-8
- Eight-axle all-terrain crane with 600 tonne capacity from Tadano.
- Tandem Crawler Lift
- Lift performed with two crawler cranes acting together on a single load.
- Tandem Lift
- Use of two cranes simultaneously on a single load.
- Tank Trailer Heavy
- Trailer purpose-built for chemical or process tank transport.
- Telescoping Boom Crane
- Crane with hydraulically extending boom sections, common up to about 1,200 tonnes.
- Temperature Excursion
- Departure of cargo temperature from agreed range during transit.
- Temporary Bridge
- Modular bridge installed to allow a heavy haul to cross weak structures or culverts.
- Terex CC 6800
- Crawler crane in the 1,250 tonne class formerly built under the Terex brand.
- Terex Powerlift 7000
- Heavy duty crane in the Terex range used in industrial lift work.
- Test Lift
- Trial lift at low height to confirm balance and rigging before a full lift.